Works contractor profit, where job-level measurement finds the pattern.

Your numbers

$
$
$
$
$
%

Result

Net profit $1,066
Net margin 7.72%
Gross profit $3,550
Overhead absorbed $2,484
Gross profit is $3,550 (25.72%). After $2,484 of overhead you keep $1,066, a 7.72% net margin.

Overhead is charged as a percentage of the contract price. Jobs that tie up your crew for longer than their price suggests actually absorb more overhead than this method shows.

Get a Free Business Audit

How the calculation works

Revenue less direct costs less overhead, giving profit and margin. Measured at job level rather than only annually it becomes the feedback loop that improves estimating, because the variance between estimated and actual cost is systematic rather than random.

What moves the number

  • Actual job costs against estimate.
  • Labour hours, the usual source of variance.
  • Change orders and whether they were charged.
  • Overhead recovery across the jobs completed.

Where this one goes wrong

Work performed outside the original scope and never charged is the single largest quiet loss in contracting, because it happens in small increments that nobody documents and together they consume the margin. Write change orders for everything. Comparing actual against estimated cost by job type then shows which types have been underpriced consistently, which is more valuable than any individual job's result.

Before you quote

  • Compare actual against estimated cost on every job.
  • Write change orders for work outside the original scope.
  • Review variance by job type to find the pattern.

Questions

About this calculator

Where does contractor profit leak?

Work outside the original scope that was never charged. It happens in small increments nobody documents, and together they consume the margin. Writing change orders for everything is the discipline that stops it.

Why measure profit per job?

Because the estimating error is systematic rather than random. Comparing actual against estimated cost by job type shows which types have been underpriced consistently, which is worth more than any individual job's result.

What causes most cost variance?

Labour hours, generally. Material quantities are reasonably predictable while hours depend on access, conditions and what gets discovered, which is why hours against estimate is the figure worth tracking most closely.

How useful was this calculator?

Not rated yet. Yours would be the first.

Put this calculator on your site

Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.

Please keep the attribution line. It is the only thing we ask in return.

How to use this calculator

  1. Contract price ($). Enter your own figure; the page starts at $13,800.
  2. Materials ($). Enter your own figure; the page starts at $4,200.
  3. Labour (burdened) ($). Enter your own figure; the page starts at $3,600.
  4. Subcontractors ($). Enter your own figure; the page starts at $1,800.
  5. Permits, equipment, disposal ($). Enter your own figure; the page starts at $650.
  6. Overhead as a share of revenue (%). Enter your own figure; the page starts at 18%.

The result updates as you type, so you can try a figure, see what it does to net profit, and change it back. Nothing you enter is sent anywhere or saved.

A worked example

These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.

What goes in

InputValue
Contract price$13,800
Materials$4,200
Labour (burdened)$3,600
Subcontractors$1,800
Permits, equipment, disposal$650
Overhead as a share of revenue18%

What comes out

ResultValue
Net profit main result$1,066
Net margin7.72%
Gross profit$3,550
Overhead absorbed$2,484

Gross profit is $3,550 (25.72%). After $2,484 of overhead you keep $1,066, a 7.72% net margin.

How sensitive the answer is

Holding everything else steady and changing only contract price, this is what happens to net profit. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.

Contract price ($)Net profit
$6,900 -$4,592
$10,350 -$1,763
$13,800 example above $1,066
$20,700 $6,724
$27,600 $12,382

Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.

What each figure means

Contract price ($)
A money amount, starting at $13,800.
Materials ($)
A money amount, starting at $4,200.
Labour (burdened) ($)
A money amount, starting at $3,600.
Subcontractors ($)
A money amount, starting at $1,800.
Permits, equipment, disposal ($)
A money amount, starting at $650.
Overhead as a share of revenue (%)
A percentage, between 0 and 90, starting at 18%.

What the results tell you

ResultWhat it is
Net profitThe headline result. A money figure.
Net marginA percentage.
Gross profitA money figure.
Overhead absorbedA money figure.

Overhead is where these go wrong

Pricing and margin figures are only as good as the cost you put in. If your cost covers parts and wages but not the van, the insurance, the phone and the unbilled hours, the markup is paying for those before it becomes profit, and the margin you think you are making is not the one you are making.

Estimating is the easy part

The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.