Topsoil Calculator

Work out topsoil volume from area and depth, with compaction accounted for.

Your numbers

ft
ft
in
%
$

Result

Cubic yards needed 20.4
Cubic feet 550.0
Approximate tons 22.4 Screened topsoil is roughly 2,200 lb per cubic yard
Estimated cost $692.59
You need about 20.4 cubic yards (22.4 tons), costing roughly $692.59 delivered.

Topsoil settles noticeably after watering and compaction, often by 10–20%. Order for the finished depth you want rather than the loose depth.

Get a Free Business Audit

What moves the number

  • Finished depth required, which depends on what is being grown.
  • Compaction, since soil delivered loose settles noticeably once laid and watered.
  • Whether existing grade needs building up or only dressing.

Where this one goes wrong

Ordering to the finished depth without allowing for settlement. Screened topsoil delivered loose compacts once it is spread and watered, and a job ordered exactly to the calculation finishes low.

Questions

About this calculator

How much does topsoil settle?

Enough to matter on any depth worth calculating. Loose delivered soil compacts under its own weight and with watering, so an allowance above the finished depth is normal.

How deep does topsoil need to be?

It depends on what is going into it. Turf needs less than a planting bed, and a bed for deep-rooted planting needs more again.

Is screened soil worth the premium?

For anything being planted or turfed, usually. Unscreened soil brings stones, roots and weed seed, and the labour to deal with those on site costs more than the screening.

How useful was this calculator?

Not rated yet. Yours would be the first.

The formula

cubic yards = length × width × (depth ÷ 12) ÷ 27

Put this calculator on your site

Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.

Please keep the attribution line. It is the only thing we ask in return.

How to use this calculator

  1. Length (ft) (ft). Enter your own figure; the page starts at 50 ft.
  2. Width (ft) (ft). Enter your own figure; the page starts at 30 ft.
  3. Depth (inches) (in). Enter your own figure; the page starts at 4 in.
  4. Waste / compaction allowance (%). Enter your own figure; the page starts at 10%.
  5. Cost per cubic yard delivered ($). Enter your own figure; the page starts at $34.

The result updates as you type, so you can try a figure, see what it does to cubic yards needed, and change it back. Nothing you enter is sent anywhere or saved.

A worked example

These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.

What goes in

InputValue
Length (ft)50 ft
Width (ft)30 ft
Depth (inches)4 in
Waste / compaction allowance10%
Cost per cubic yard delivered$34

What comes out

ResultValue
Cubic yards needed main result20.4
Cubic feet550.0
Approximate tons22.4
Estimated cost$692.59

You need about 20.4 cubic yards (22.4 tons), costing roughly $692.59 delivered.

How sensitive the answer is

Holding everything else steady and changing only cost per cubic yard delivered, this is what happens to cubic yards needed. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.

Cost per cubic yard delivered ($)Cubic yards needed
$17 20.4
$26 20.4
$34 example above 20.4
$51 20.4
$68 20.4

Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.

What each figure means

Length (ft) (ft)
Measured in ft, starting at 50 ft.
Width (ft) (ft)
Measured in ft, starting at 30 ft.
Depth (inches) (in)
Measured in in, starting at 4 in.
Waste / compaction allowance (%)
A percentage, between 0 and 60, starting at 10%.
Cost per cubic yard delivered ($)
A money amount, starting at $34.

What the results tell you

ResultWhat it is
Cubic yards neededThe headline result. A decimal figure.
Cubic feetA decimal figure.
Approximate tonsA decimal figure.
Estimated costA money figure.

Seasonality is not in this

Coverage and material figures assume the area you enter. Slope, access for machinery, existing growth and the time of year all affect both quantity and labour, and none of them appear in a calculation like this.

Estimating is the easy part

The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.