bdevy.

Contractor & construction

Siding Calculator

Works siding quantities, where the trim pieces are a large part of the order.

Your numbers

ft
ft
sq ft
%
Cuts around windows, doors and corners.
$

Result

Squares needed 16
Area 1,400.0 Square feet
Area including waste 1,568.0
Estimated material cost $3,840
Approx. trim (linear ft) 49 Corners and openings
For 1,400.0 sq ft plus 12% waste you need 16 squares, costing about $3,840.

A siding square covers 100 square feet. Openings are not deducted because offcuts around them are usually unusable, on a wall with very large glazing, deduct manually.

Get a Free Business Audit

How the calculation works

Wall area less large openings, divided by the coverage per unit, with a waste allowance, plus starter strip, corner posts, trim and channel around openings. The trim is a substantial share of a siding order and is the part most often underestimated.

What moves the number

  • Wall area and the openings deducted.
  • Waste allowance, which varies by material and pattern.
  • Linear feet of corners, trim and channel.
  • Gable ends, which generate heavy cut waste.

Where this one goes wrong

Gables, dormers and anything with angles generate far more waste than a flat wall, because the cuts cannot be used elsewhere, which means a single waste percentage across a whole house underestimates the complex elevations. Measure the trim in linear feet from the elevations, since corner posts, J-channel around every opening and starter strip add up to a quantity nobody estimates accurately by eye.

Before you quote

  • Raise the waste allowance for gables, dormers and angled cuts.
  • Measure trim and channel in linear feet from the elevations.
  • Include starter strip and corner posts in the takeoff.

Questions

About this calculator

How much waste should siding allow?

More on complex elevations than flat walls, because angled cuts at gables and dormers cannot be used elsewhere. A single percentage across a whole house underestimates the complex elevations and oversupplies the simple ones.

What is most often underestimated?

Trim: corner posts, J-channel around every opening, starter strip and finish trim. Measured in linear feet from the elevations it is a substantial share of the order, and nobody estimates it accurately by eye.

Should openings be deducted?

Large ones yes, and the cuts around them generate waste that partly offsets the saving. Small openings are generally better left in the area, since deducting them tends to leave the order short once the cutting is done.

How useful was this calculator?

Not rated yet. Yours would be the first.

Put this calculator on your site

Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.

Please keep the attribution line. It is the only thing we ask in return.

How to use this calculator

  1. Total wall length (ft) (ft). Enter your own figure; the page starts at 140 ft.
  2. Average wall height (ft) (ft). Enter your own figure; the page starts at 10 ft.
  3. Coverage per square (sq ft) (sq ft). Enter your own figure; the page starts at 100 sq ft.
  4. Waste allowance (%). Cuts around windows, doors and corners.
  5. Cost per square ($). Enter your own figure; the page starts at $240.

The result updates as you type, so you can try a figure, see what it does to squares needed, and change it back. Nothing you enter is sent anywhere or saved.

A worked example

These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.

What goes in

InputValue
Total wall length (ft)140 ft
Average wall height (ft)10 ft
Coverage per square (sq ft)100 sq ft
Waste allowance12%
Cost per square$240

What comes out

ResultValue
Squares needed main result16
Area1,400.0
Area including waste1,568.0
Estimated material cost$3,840
Approx. trim (linear ft)49

For 1,400.0 sq ft plus 12% waste you need 16 squares, costing about $3,840.

How sensitive the answer is

Holding everything else steady and changing only cost per square, this is what happens to squares needed. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.

Cost per square ($)Squares needed
$120 16
$180 16
$240 example above 16
$360 16
$480 16

Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.

What each figure means

Total wall length (ft) (ft)
Measured in ft, starting at 140 ft.
Average wall height (ft) (ft)
Measured in ft, starting at 10 ft.
Coverage per square (sq ft) (sq ft)
Measured in sq ft, starting at 100 sq ft.
Waste allowance (%)
Cuts around windows, doors and corners.
Cost per square ($)
A money amount, starting at $240.

What the results tell you

ResultWhat it is
Squares neededThe headline result. A number.
AreaA decimal figure.
Area including wasteA decimal figure.
Estimated material costA money figure.
Approx. trim (linear ft)A number.

Overhead is where these go wrong

Pricing and margin figures are only as good as the cost you put in. If your cost covers parts and wages but not the van, the insurance, the phone and the unbilled hours, the markup is paying for those before it becomes profit, and the margin you think you are making is not the one you are making.

Estimating is the easy part

The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.