bdevy.

HVAC

HVAC Break-Even Calculator

Before a single dollar of profit, the month has to pay for itself. This shows the number of jobs that gets you there.

Your numbers

$
Rent, salaries, insurance, vehicle payments, software, marketing retainers. What you owe before any job is run.
$
$
Parts, materials and direct labour that only exist because the job exists.
days

Result

Jobs per month to break even 72
Revenue to break even $86,897
Jobs per working day 3.3
Contribution per job $580 What each job puts toward fixed costs
You need 72 jobs a month ($86,897) just to cover fixed costs, about 3.3 a day. Everything past that is profit.

This assumes one average job type. If replacements and service calls have very different economics, run it separately for each rather than blending them into one average.

Get a Free Business Audit

What moves the number

  • Fixed costs, which run level while HVAC demand is strongly seasonal.
  • Contribution per job, which differs sharply between a service call and a changeout.
  • The months where demand does not cover the fixed base.

Where this one goes wrong

Working from an annual average. HVAC demand concentrates in the first hot and first cold weeks, and a break-even that holds across the year can be missed for months at a time in spring and autumn.

Questions

About this calculator

What counts as a fixed cost?

Anything you owe whether or not you run a single job this month: rent, office salaries, insurance, loan and lease payments, software subscriptions and marketing retainers.

Should the owner's pay be in there?

Yes, if you take a regular salary. Leaving it out makes break-even look lower than it is and hides the fact that you are funding the business personally.

What if my jobs vary wildly in size?

Run the calculator separately for each major job type, or use a weighted average price and variable cost based on your actual job mix over the last quarter.

How useful was this calculator?

Not rated yet. Yours would be the first.

Put this calculator on your site

Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.

Please keep the attribution line. It is the only thing we ask in return.

How to use this calculator

  1. Fixed costs per month ($). Rent, salaries, insurance, vehicle payments, software, marketing retainers. What you owe before any job is run.
  2. Average job price ($). Enter your own figure; the page starts at $1,200.
  3. Variable cost per job ($). Parts, materials and direct labour that only exist because the job exists.
  4. Working days per month (days). Enter your own figure; the page starts at 22 days.

The result updates as you type, so you can try a figure, see what it does to jobs per month to break even, and change it back. Nothing you enter is sent anywhere or saved.

A worked example

These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.

What goes in

InputValue
Fixed costs per month$42,000
Average job price$1,200
Variable cost per job$620
Working days per month22 days

What comes out

ResultValue
Jobs per month to break even main result72
Revenue to break even$86,897
Jobs per working day3.3
Contribution per job$580

You need 72 jobs a month ($86,897) just to cover fixed costs, about 3.3 a day. Everything past that is profit.

How sensitive the answer is

Holding everything else steady and changing only fixed costs per month, this is what happens to jobs per month to break even. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.

Fixed costs per month ($)Jobs per month to break even
$21,000 36
$31,500 54
$42,000 example above 72
$63,000 109
$84,000 145

Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.

What each figure means

Fixed costs per month ($)
Rent, salaries, insurance, vehicle payments, software, marketing retainers. What you owe before any job is run.
Average job price ($)
A money amount, starting at $1,200.
Variable cost per job ($)
Parts, materials and direct labour that only exist because the job exists.
Working days per month (days)
Measured in days, between 1 and 31, starting at 22 days.

What the results tell you

ResultWhat it is
Jobs per month to break evenThe headline result. A number.
Revenue to break evenA money figure.
Jobs per working dayA decimal figure.
Contribution per jobA money figure.

Before you rely on this number

Sizing, capacity and load figures here are planning estimates. A real installation depends on the manufacturer's data for the specific equipment, the duct system it is going into, and a proper load calculation for the building. Use this to sanity-check a number or price a job, not to select equipment.

Break-even is easier with the leads you already paid for

Most contractors do not need more leads. They need to stop losing the ones that already call.