Cleaning & janitorial
Office Cleaning Cost Calculator
Price office cleaning from area, production rate and the frequency the contract specifies.
Result
A planning estimate, not a quote. Access, the age of the equipment, what is found once it is opened up and local labour rates all move the real figure, sometimes a long way.
Get a Free Business AuditWhat moves the number
- Production rate in area per hour, which is the core figure in commercial cleaning.
- Density of obstacles, since open plan cleans far faster than cellular offices.
- Washroom count, which takes disproportionate time per square foot.
Where this one goes wrong
Applying one production rate to a whole building. Open plan, cellular offices, washrooms, kitchens and circulation all clean at very different rates, and a single rate across the floor area will be wrong on most of it.
Questions
About this calculator
What is a production rate?
The area one cleaner covers per hour at a given standard. It is the figure commercial cleaning is costed from, and it varies enormously by space type.
Why do washrooms matter so much?
Because they take far more time per square foot than any other area and they determine how the contract is judged. Costing them at the general rate underprices the contract.
Should frequency vary by area?
Frequently yes. Circulation and washrooms may need daily attention where meeting rooms and storage need less, and a uniform frequency overspends on some areas and underserves others.
The formula
total = hours x people x rate + parts + call-out, then sales tax
Put this calculator on your site
Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.
Please keep the attribution line. It is the only thing we ask in return.
How to use this calculator
- Hours on site (h). Enter your own figure; the page starts at 3 h.
- People needed. Enter your own figure; the page starts at 1.
- Labour rate charged ($). Enter your own figure; the page starts at $55.
- Parts and materials ($). Enter your own figure; the page starts at $12.
- Call-out or diagnostic fee ($). Enter your own figure; the page starts at $95.
- Sales tax (%). Leave at zero if you are quoting before tax.
The result updates as you type, so you can try a figure, see what it does to estimated total, and change it back. Nothing you enter is sent anywhere or saved.
A worked example
These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.
What goes in
| Input | Value |
|---|---|
| Hours on site | 3 h |
| People needed | 1 |
| Labour rate charged | $55 |
| Parts and materials | $12 |
| Call-out or diagnostic fee | $95 |
| Sales tax | 0% |
What comes out
| Result | Value |
|---|---|
| Estimated total main result | $272 |
| Labour | $165 |
| Before tax | $272 |
| Sales tax | $0 |
About $272: $165 of labour, $12 of parts and a $95 call-out.
How sensitive the answer is
Holding everything else steady and changing only labour rate charged, this is what happens to estimated total. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.
| Labour rate charged ($) | Estimated total |
|---|---|
| $28 | $191 |
| $41 | $230 |
| $55 example above | $272 |
| $83 | $356 |
| $110 | $437 |
Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.
What each figure means
- Hours on site (h)
- Measured in h, between 0 and 400, starting at 3 h.
- People needed
- A number, between 0 and 40, starting at 1.
- Labour rate charged ($)
- A money amount, starting at $55.
- Parts and materials ($)
- A money amount, starting at $12.
- Call-out or diagnostic fee ($)
- A money amount, starting at $95.
- Sales tax (%)
- Leave at zero if you are quoting before tax.
What the results tell you
| Result | What it is |
|---|---|
| Estimated total | The headline result. A money figure. |
| Labour | A money figure. |
| Before tax | A money figure. |
| Sales tax | A money figure. |
Time is the variable that bites
Pricing that works out on paper fails when the job takes longer than quoted. First cleans, heavily soiled sites and access problems all run over, so it is worth pricing the first visit separately from the recurring one.
Estimating is the easy part
The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.