bdevy.

HVAC

HVAC Estimate Calculator

Build an estimate from equipment, labour, materials and the items a changeout usually needs but rarely gets quoted.

Your numbers

$
$
$
$
%
$
$
%

Result

Selling price $7,381
Total job cost $4,428
Gross profit $2,952
Equivalent markup 66.67%
This job costs $4,428 to deliver. $478.40 of that is burdened labour across 16 hours. At a 40% target margin it sells for $7,381, leaving $2,952 of gross profit. Applying a 40% markup instead would price it at only $6,200, $1,181 less on the same job.

Labour is burdened here, not waged: payroll taxes, workers' comp, insurance, PTO and benefits ride on top of the hourly rate, and 25–35% is a common range. Calculate yours from last year's payroll rather than assuming. This model recovers overhead in the whole-job margin, so do not also load overhead into the labour rate. That recovers it twice and prices you out of the market.

Read how to estimate an HVAC job

What moves the number

  • Equipment and the accessories it requires rather than the bare unit.
  • Labour hours by crew, including the second visit if commissioning is separate.
  • Permit, disposal, pad, disconnect, whip and thermostat, all routine and all easily missed.

Where this one goes wrong

Presenting a single total. A customer comparing three quotes at one number each cannot see that yours includes the electrical work and the others do not, so the cheapest wins on a comparison that was never like for like.

Questions

About this calculator

Should an estimate itemise or total?

Show enough detail that a customer can see what is included, particularly the items others omit. A single figure loses every comparison against a quote that excluded half the work.

How long should an HVAC estimate hold?

Long enough for a considered decision and short enough that equipment pricing has not moved. Put the date on the document and apply it.

What should be excluded explicitly?

Electrical upgrades, duct modification, asbestos or other hazardous material handling, and anything discovered once the old equipment is out. Naming them prevents the argument.

How useful was this calculator?

Not rated yet. Yours would be the first.

Put this calculator on your site

Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.

Please keep the attribution line. It is the only thing we ask in return.

How to use this calculator

  1. Equipment cost (net after rebates) ($). Enter your own figure; the page starts at $3,150.
  2. Materials: lineset, pad, whip, plenum, drain, misc ($). Enter your own figure; the page starts at $620.
  3. Lead installer hours. Enter your own figure; the page starts at 8.
  4. Lead installer wage per hour ($). Enter your own figure; the page starts at $28.
  5. Helper hours. Enter your own figure; the page starts at 8.
  6. Helper wage per hour ($). Enter your own figure; the page starts at $18.

The result updates as you type, so you can try a figure, see what it does to selling price, and change it back. Nothing you enter is sent anywhere or saved.

A worked example

These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.

What goes in

InputValue
Equipment cost (net after rebates)$3,150
Materials: lineset, pad, whip, plenum, drain, misc$620
Lead installer hours8
Lead installer wage per hour$28
Helper hours8
Helper wage per hour$18
Labour burden30%
Permits, inspection and disposal$180
Subcontractors$0
Target gross margin40%

What comes out

ResultValue
Selling price main result$7,381
Total job cost$4,428
Gross profit$2,952
Equivalent markup66.67%

This job costs $4,428 to deliver. $478.40 of that is burdened labour across 16 hours. At a 40% target margin it sells for $7,381, leaving $2,952 of gross profit. Applying a 40% markup instead would price it at only $6,200, $1,181 less on the same job.

How sensitive the answer is

Holding everything else steady and changing only equipment cost (net after rebates), this is what happens to selling price. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.

Equipment cost (net after rebates) ($)Selling price
$1,575 $4,756
$2,363 $6,069
$3,150 example above $7,381
$4,725 $10,006
$6,300 $12,631

Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.

What each figure means

Equipment cost (net after rebates) ($)
A money amount, starting at $3,150.
Materials: lineset, pad, whip, plenum, drain, misc ($)
A money amount, starting at $620.
Lead installer hours
A number, between 0 and 500, starting at 8.
Lead installer wage per hour ($)
A money amount, starting at $28.
Helper hours
A number, between 0 and 500, starting at 8.
Helper wage per hour ($)
A money amount, starting at $18.
Labour burden (%)
A percentage, between 0 and 120, starting at 30%.
Permits, inspection and disposal ($)
A money amount, starting at $180.
Subcontractors ($)
A money amount, starting at $0.
Target gross margin (%)
A percentage, between 0 and 95, starting at 40%.

What the results tell you

ResultWhat it is
Selling priceThe headline result. A money figure.
Total job costA money figure.
Gross profitA money figure.
Equivalent markupA percentage.

Before you rely on this number

Sizing, capacity and load figures here are planning estimates. A real installation depends on the manufacturer's data for the specific equipment, the duct system it is going into, and a proper load calculation for the building. Use this to sanity-check a number or price a job, not to select equipment.

See the whole estimate, not just the price

This calculator is one step of the process. The full walkthrough covers the site visit, the takeoff, burdened labour and the document itself, and the demo builds a complete proposal.