bdevy.

Cleaning & janitorial

Cleaning Square Foot Pricing Calculator

Work out a price per square foot from production rate and labour cost, and check what it implies.

Your numbers

$
Burdened: wages plus tax, insurance and the vehicle, not the hourly wage.
$
$
Permits, disposal, equipment hire, subcontractors.
%
Overhead as a share of revenue. Work it out from last year's accounts.
%

Result

Price to quote $171.43
Direct cost $108
Overhead recovered $37.71
Net profit $25.71
Gross margin 37.0%
Markup on direct cost 58.7%
Quote $171.43 to cover $108 of direct cost, recover $37.71 of overhead and leave $25.71 of net profit. That is a 58.7% markup on cost.

Overhead and margin are taken as shares of the selling price, which is why the cost is divided rather than multiplied. Adding 15% to cost does not produce a 15% margin. Gross profit is what is left after the cost of doing the job. Overhead comes out of that: the building, the office wages, the vans, insurance, software and advertising. A healthy gross margin still loses money if overhead is larger.

Get a Free Business Audit

What moves the number

  • Production rate, which is what converts area into hours.
  • Fully burdened labour cost per hour.
  • Frequency, since price per square foot means nothing without it.

Where this one goes wrong

Comparing square foot rates between buildings without matching the specification and frequency. A rate that looks competitive on a daily clean of open plan is unprofitable on a three times weekly clean of a cellular office.

Questions

About this calculator

Is price per square foot a good way to quote?

It is a useful check rather than a method. The price has to come from hours and cost; the square foot figure is what you compare afterwards to see whether it is in a sensible range.

Why do square foot rates vary so much?

Because specification, frequency and space type all change the hours required. Two buildings of identical size can legitimately differ by a wide margin.

What is a competitive rate?

There is no universal answer because it depends entirely on specification. Anyone quoting a rate without a specification is quoting for work nobody has defined.

How useful was this calculator?

Not rated yet. Yours would be the first.

The formula

price = direct cost / (1 - overhead% - margin%)

Put this calculator on your site

Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.

Please keep the attribution line. It is the only thing we ask in return.

How to use this calculator

  1. Labour cost ($). Burdened: wages plus tax, insurance and the vehicle, not the hourly wage.
  2. Materials cost ($). Enter your own figure; the page starts at $12.
  3. Other direct costs ($). Permits, disposal, equipment hire, subcontractors.
  4. Overhead rate (%). Overhead as a share of revenue. Work it out from last year's accounts.
  5. Target net margin (%). Enter your own figure; the page starts at 15%.

The result updates as you type, so you can try a figure, see what it does to price to quote, and change it back. Nothing you enter is sent anywhere or saved.

A worked example

These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.

What goes in

InputValue
Labour cost$96
Materials cost$12
Other direct costs$0
Overhead rate22%
Target net margin15%

What comes out

ResultValue
Price to quote main result$171.43
Direct cost$108
Overhead recovered$37.71
Net profit$25.71
Gross margin37.0%
Markup on direct cost58.7%

Quote $171.43 to cover $108 of direct cost, recover $37.71 of overhead and leave $25.71 of net profit. That is a 58.7% markup on cost.

How sensitive the answer is

Holding everything else steady and changing only labour cost, this is what happens to price to quote. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.

Labour cost ($)Price to quote
$48 $95.24
$72 $133.33
$96 example above $171.43
$144 $247.62
$192 $323.81

Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.

What each figure means

Labour cost ($)
Burdened: wages plus tax, insurance and the vehicle, not the hourly wage.
Materials cost ($)
A money amount, starting at $12.
Other direct costs ($)
Permits, disposal, equipment hire, subcontractors.
Overhead rate (%)
Overhead as a share of revenue. Work it out from last year's accounts.
Target net margin (%)
A percentage, between 0 and 80, starting at 15%.

What the results tell you

ResultWhat it is
Price to quoteThe headline result. A money figure.
Direct costA money figure.
Overhead recoveredA money figure.
Net profitA money figure.
Gross marginA percentage.
Markup on direct costA percentage.

Time is the variable that bites

Pricing that works out on paper fails when the job takes longer than quoted. First cleans, heavily soiled sites and access problems all run over, so it is worth pricing the first visit separately from the recurring one.

Estimating is the easy part

The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.