bdevy.

Cleaning & janitorial

Job Cost Calculator

Total what one clean actually costs: hours, travel, product and the equipment consumed.

Your numbers

h
$
%
Payroll tax, insurance, holiday, training. On top of the wage.
$
h
$
Annual overhead divided by billable hours.

Result

True job cost $2,039
Labour including burden $1,037
Overhead absorbed $990
Cost per labour hour $45.31
The job costs $2,039: $1,037 of burdened labour, $12 of materials and $990 of overhead. Anything you charge below that loses money.

Travel time is counted because it is paid and it occupies the day, whether or not the customer sees it on the invoice. Gross profit is what is left after the cost of doing the job. Overhead comes out of that: the building, the office wages, the vans, insurance, software and advertising. A healthy gross margin still loses money if overhead is larger.

Get a Free Business Audit

What moves the number

  • Cleaner hours at burdened cost including travel.
  • Product at working dilution.
  • Cloths, pads and consumables replaced over time.

Where this one goes wrong

Costing time on site only. Travel between properties is paid and unbillable, and on a round of short domestic visits it can be a third of the day.

Questions

About this calculator

How much does travel cost on a cleaning round?

More than most operators expect on short visits. Two hours of work with forty minutes of driving between each is a very different day from the same work in one building.

Is product cost significant?

Small per clean and worth knowing, because it varies enormously between a maintenance visit and a deep clean. Working it out from dilution is straightforward.

What is usually missing from job costing?

Travel, equipment wear and the time spent on access, setup and packing down at each property.

How useful was this calculator?

Not rated yet. Yours would be the first.

The formula

cost = (job hours + travel) x crew x wage x (1 + burden%) + materials + overhead per hour

Put this calculator on your site

Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.

Please keep the attribution line. It is the only thing we ask in return.

How to use this calculator

  1. Labour hours (h). Enter your own figure; the page starts at 3 h.
  2. People on the job. Enter your own figure; the page starts at 12.
  3. Hourly wage ($). Enter your own figure; the page starts at $18.
  4. Labour burden (%). Payroll tax, insurance, holiday, training. On top of the wage.
  5. Materials ($). Enter your own figure; the page starts at $12.
  6. Travel hours (h). Enter your own figure; the page starts at 0.75 h.

The result updates as you type, so you can try a figure, see what it does to true job cost, and change it back. Nothing you enter is sent anywhere or saved.

A worked example

These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.

What goes in

InputValue
Labour hours3 h
People on the job12
Hourly wage$18
Labour burden28%
Materials$12
Travel hours0.75 h
Overhead per working hour$22

What comes out

ResultValue
True job cost main result$2,039
Labour including burden$1,037
Overhead absorbed$990
Cost per labour hour$45.31

The job costs $2,039: $1,037 of burdened labour, $12 of materials and $990 of overhead. Anything you charge below that loses money.

How sensitive the answer is

Holding everything else steady and changing only hourly wage, this is what happens to true job cost. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.

Hourly wage ($)True job cost
$9 $1,520
$13.5 $1,780
$18 example above $2,039
$27 $2,557
$36 $3,076

Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.

What each figure means

Labour hours (h)
Measured in h, starting at 3 h.
People on the job
A number, between 0 and 30, starting at 12.
Hourly wage ($)
A money amount, starting at $18.
Labour burden (%)
Payroll tax, insurance, holiday, training. On top of the wage.
Materials ($)
A money amount, starting at $12.
Travel hours (h)
Measured in h, starting at 0.75 h.
Overhead per working hour ($)
Annual overhead divided by billable hours.

What the results tell you

ResultWhat it is
True job costThe headline result. A money figure.
Labour including burdenA money figure.
Overhead absorbedA money figure.
Cost per labour hourA money figure.

Time is the variable that bites

Pricing that works out on paper fails when the job takes longer than quoted. First cleans, heavily soiled sites and access problems all run over, so it is worth pricing the first visit separately from the recurring one.

Estimating is the easy part

The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.