Prices a water loss, where the category of the water and the class of the loss set the scope.

Your numbers

h
$
$
$
%
Leave at zero if you are quoting before tax.

Result

Estimated total $4,365
Labour $2,970
Before tax $4,365
Sales tax $0
About $4,365: $2,970 of labour, $1,300 of parts and a $95 call-out.

A planning estimate, not a quote. Access, the age of the equipment, what is found once it is opened up and local labour rates all move the real figure, sometimes a long way.

Get a Free Business Audit

How the calculation works

Hours times crew times rate, plus equipment and materials and the call-out. What determines the scope is not the volume of water but two classifications the industry works to. Category describes how contaminated the water is, from clean supply water through water carrying significant contamination to grossly contaminated water, and it rises over time as clean water sits. Class describes how much of the structure absorbed it and therefore how hard it is to dry. Together they decide what dries in place and what has to be removed, which is most of the cost.

What moves the number

  • Water category, which rises with time and dictates what can be salvaged.
  • Class of loss, meaning how much porous material absorbed water.
  • Equipment days, since air movers and dehumidifiers are charged per unit per day.
  • Whether affected materials are removed or dried in place.

Where this one goes wrong

Category changes with time, and that is the single most important fact in this trade. Clean supply water left sitting becomes contaminated as it picks up material and supports growth, so a loss that could have been dried becomes a loss that has to be stripped, and the difference is large. That is why response time matters more than crew size. Documentation is the other professional requirement: moisture readings by location and date, equipment placement, and photographs are what justify the scope to an insurer, and work done without them is work that may not be paid for. In pre-1978 buildings, removing wet materials can disturb lead paint, which brings its own requirements.

Before you quote

  • Record category and class, and the reasoning, at the first inspection.
  • Log moisture readings by location and date throughout drying.
  • Document equipment placement and run days with photographs.
  • Check for lead paint before removing materials in pre-1978 buildings.

Where the rules come from

Questions

About this calculator

Why does the type of water matter so much?

Because it decides what can be saved. Clean supply water allows much to be dried in place. Water carrying contamination, and water that has been sitting long enough to become contaminated, requires porous materials to be removed instead. The classification drives the scope, and the scope is the cost.

Does waiting make it worse?

Substantially, and not only through more water spreading. Clean water becomes contaminated as it sits, which moves the loss into a category where materials have to be removed rather than dried. A fast response can be the difference between drying a floor and replacing it.

Why so much documentation?

Because the work is usually paid by an insurer against a justified scope rather than by a homeowner against a quote. Moisture readings by location and date, equipment logs and photographs are the evidence that the scope was necessary. Work performed without them is work that may not be reimbursed.

How useful was this calculator?

Not rated yet. Yours would be the first.

The formula

total = hours x people x rate + parts + call-out, then sales tax

Put this calculator on your site

Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.

Please keep the attribution line. It is the only thing we ask in return.

How to use this calculator

  1. Hours on site (h). Enter your own figure; the page starts at 22 h.
  2. People needed. Enter your own figure; the page starts at 1.
  3. Labour rate charged ($). Enter your own figure; the page starts at $135.
  4. Parts and materials ($). Enter your own figure; the page starts at $1,300.
  5. Call-out or diagnostic fee ($). Enter your own figure; the page starts at $95.
  6. Sales tax (%). Leave at zero if you are quoting before tax.

The result updates as you type, so you can try a figure, see what it does to estimated total, and change it back. Nothing you enter is sent anywhere or saved.

A worked example

These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.

What goes in

InputValue
Hours on site22 h
People needed1
Labour rate charged$135
Parts and materials$1,300
Call-out or diagnostic fee$95
Sales tax0%

What comes out

ResultValue
Estimated total main result$4,365
Labour$2,970
Before tax$4,365
Sales tax$0

About $4,365: $2,970 of labour, $1,300 of parts and a $95 call-out.

How sensitive the answer is

Holding everything else steady and changing only labour rate charged, this is what happens to estimated total. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.

Labour rate charged ($)Estimated total
$68 $2,891
$101 $3,617
$135 example above $4,365
$203 $5,861
$270 $7,335

Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.

What each figure means

Hours on site (h)
Measured in h, between 0 and 400, starting at 22 h.
People needed
A number, between 0 and 40, starting at 1.
Labour rate charged ($)
A money amount, starting at $135.
Parts and materials ($)
A money amount, starting at $1,300.
Call-out or diagnostic fee ($)
A money amount, starting at $95.
Sales tax (%)
Leave at zero if you are quoting before tax.

What the results tell you

ResultWhat it is
Estimated totalThe headline result. A money figure.
LabourA money figure.
Before taxA money figure.
Sales taxA money figure.

Estimating is the easy part

The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.