Solar Installation Time Calculator
How long an installation takes, from system size, roof type and crew size.
Result
Install time here covers the physical work only. Permitting, utility interconnection approval, inspection scheduling and any required electrical service upgrade routinely take far longer than the installation and are what actually determines how long a customer waits.
Get a Free Business AuditQuestions
About this calculator
Why do extra roof planes cost so much time?
Each plane means separate rail layout, separate flashing, more conduit routing and often a separate string. Two small planes take noticeably longer than one large one of the same area.
What about permitting time?
Not included, and it is usually the longest part. Permit review and utility approval can run weeks to months depending on jurisdiction, while the roof work is one or two days.
The formula
hours = kW x base hours per kW x roof factor x plane factor, plus battery time
Put this calculator on your site
Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.
Please keep the attribution line. It is the only thing we ask in return.
Keep going
Related calculators
Estimating is the easy part
The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.