bdevy.

Security & low voltage

Security Job Cost Calculator

Costs a security job, where cable and connectors are the material line people forget.

Your numbers

h
$
%
Payroll tax, insurance, holiday, training. On top of the wage.
$
h
$
Annual overhead divided by billable hours.

Result

True job cost $2,351
Labour including burden $873.60
Overhead absorbed $577.50
Cost per labour hour $89.57
The job costs $2,351: $873.60 of burdened labour, $900 of materials and $577.50 of overhead. Anything you charge below that loses money.

Travel time is counted because it is paid and it occupies the day, whether or not the customer sees it on the invoice. Gross profit is what is left after the cost of doing the job. Overhead comes out of that: the building, the office wages, the vans, insurance, software and advertising. A healthy gross margin still loses money if overhead is larger.

Get a Free Business Audit

How the calculation works

Direct cost from burdened labour hours, equipment, and the consumables that go with cabling. The equipment list is easy to get right because it is a bill of materials. The consumables are less so: cable by the foot, connectors, boxes, conduit and trunking where surface runs are needed, fasteners, firestopping where penetrations go through rated assemblies, and labels. Individually small, collectively a real line on a job with many runs.

What moves the number

  • Cable footage, which on a large building exceeds expectations.
  • Connectors, boxes and terminations, one set per device.
  • Firestopping materials where runs pass through rated assemblies.
  • Trunking or conduit where concealed routes are not available.

Where this one goes wrong

Firestopping is both a material cost and a compliance requirement. Cable passing through a fire-rated wall or floor has to have the penetration properly sealed with a listed system, and leaving an open hole defeats the rating of the assembly, which is exactly what an inspection looks for in a commercial building. It is cheap to do and consequential to skip. On cable, estimate footage from the actual routes rather than straight-line distances, since real runs go up, along and down and the difference across a building is substantial.

Before you quote

  • Estimate cable from actual routes, not straight-line distances.
  • Include listed firestopping for penetrations through rated assemblies.
  • Count terminations and boxes per device rather than as a lump.

Questions

About this calculator

What material costs get missed on security jobs?

Cable footage and the consumables with it: connectors, boxes, terminations, fasteners, trunking where concealment is not possible, and firestopping. Individually small, and on a job with many runs they add to a real line that a bill of materials listing only devices misses.

Does cable through a wall need firestopping?

Through a fire-rated wall or floor, yes, with a listed firestop system. An unsealed penetration defeats the assembly's rating, which is what an inspection checks in a commercial building. It is inexpensive to do properly and a genuine deficiency to leave open.

How do I estimate cable footage?

From the actual route rather than the straight-line distance, because real runs go up to a ceiling, along to a riser and down to the device. Across a building that difference is substantial, and underestimating it is a common reason a job runs short of material mid-install.

How useful was this calculator?

Not rated yet. Yours would be the first.

The formula

cost = (job hours + travel) x crew x wage x (1 + burden%) + materials + overhead per hour

Put this calculator on your site

Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.

Please keep the attribution line. It is the only thing we ask in return.

How to use this calculator

  1. Labour hours (h). Enter your own figure; the page starts at 8 h.
  2. People on the job. Enter your own figure; the page starts at 3.
  3. Hourly wage ($). Enter your own figure; the page starts at $26.
  4. Labour burden (%). Payroll tax, insurance, holiday, training. On top of the wage.
  5. Materials ($). Enter your own figure; the page starts at $900.
  6. Travel hours (h). Enter your own figure; the page starts at 0.75 h.

The result updates as you type, so you can try a figure, see what it does to true job cost, and change it back. Nothing you enter is sent anywhere or saved.

A worked example

These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.

What goes in

InputValue
Labour hours8 h
People on the job3
Hourly wage$26
Labour burden28%
Materials$900
Travel hours0.75 h
Overhead per working hour$22

What comes out

ResultValue
True job cost main result$2,351
Labour including burden$873.60
Overhead absorbed$577.50
Cost per labour hour$89.57

The job costs $2,351: $873.60 of burdened labour, $900 of materials and $577.50 of overhead. Anything you charge below that loses money.

How sensitive the answer is

Holding everything else steady and changing only hourly wage, this is what happens to true job cost. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.

Hourly wage ($)True job cost
$13 $1,914
$19.5 $2,133
$26 example above $2,351
$39 $2,788
$52 $3,225

Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.

What each figure means

Labour hours (h)
Measured in h, starting at 8 h.
People on the job
A number, between 0 and 30, starting at 3.
Hourly wage ($)
A money amount, starting at $26.
Labour burden (%)
Payroll tax, insurance, holiday, training. On top of the wage.
Materials ($)
A money amount, starting at $900.
Travel hours (h)
Measured in h, starting at 0.75 h.
Overhead per working hour ($)
Annual overhead divided by billable hours.

What the results tell you

ResultWhat it is
True job costThe headline result. A money figure.
Labour including burdenA money figure.
Overhead absorbedA money figure.
Cost per labour hourA money figure.

Estimating is the easy part

The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.