bdevy.

Roofing

Roofing Pricing Calculator

Set a roofing price from full job cost and the margin you intend, with the risk the job carries priced in.

Your numbers

$
Burdened: wages plus tax, insurance and the vehicle, not the hourly wage.
$
$
Permits, disposal, equipment hire, subcontractors.
%
Overhead as a share of revenue. Work it out from last year's accounts.
%

Result

Price to quote $10,317
Direct cost $6,500
Overhead recovered $2,270
Net profit $1,548
Gross margin 37.0%
Markup on direct cost 58.7%
Quote $10,317 to cover $6,500 of direct cost, recover $2,270 of overhead and leave $1,548 of net profit. That is a 58.7% markup on cost.

Overhead and margin are taken as shares of the selling price, which is why the cost is divided rather than multiplied. Adding 15% to cost does not produce a 15% margin. Gross profit is what is left after the cost of doing the job. Overhead comes out of that: the building, the office wages, the vans, insurance, software and advertising. A healthy gross margin still loses money if overhead is larger.

Get a Free Business Audit

What moves the number

  • Crew days rather than hours, since roofing is scheduled and weathered in days.
  • Material at landed cost including delivery and any crane or hoist.
  • Risk allowance for deck condition and weather delay.

Where this one goes wrong

Pricing roofing at the same margin as low-risk trade work. Roofing carries weather delay, fall risk, high insurance and scope that genuinely changes once the covering is off. The margin has to reflect that rather than match a general contractor's.

Questions

About this calculator

Should weather delay be priced in?

It should at least be planned for. A crew stood down is paid and produces nothing, and a season of lost days is a real cost that has to be recovered across the jobs that do run.

How do I compete with a much lower quote?

By making the inclusions visible. Roofing quotes vary mostly by what they exclude, and a customer shown the difference in deck allowance, flashing and disposal can compare properly.

Flat price or allowances?

Flat for what is visible, allowances for what is not. Pretending the deck condition is known is how a fixed price becomes an argument.

How useful was this calculator?

Not rated yet. Yours would be the first.

The formula

price = direct cost / (1 - overhead% - margin%)

Put this calculator on your site

Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.

Please keep the attribution line. It is the only thing we ask in return.

How to use this calculator

  1. Labour cost ($). Burdened: wages plus tax, insurance and the vehicle, not the hourly wage.
  2. Materials cost ($). Enter your own figure; the page starts at $3,900.
  3. Other direct costs ($). Permits, disposal, equipment hire, subcontractors.
  4. Overhead rate (%). Overhead as a share of revenue. Work it out from last year's accounts.
  5. Target net margin (%). Enter your own figure; the page starts at 15%.

The result updates as you type, so you can try a figure, see what it does to price to quote, and change it back. Nothing you enter is sent anywhere or saved.

A worked example

These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.

What goes in

InputValue
Labour cost$2,600
Materials cost$3,900
Other direct costs$0
Overhead rate22%
Target net margin15%

What comes out

ResultValue
Price to quote main result$10,317
Direct cost$6,500
Overhead recovered$2,270
Net profit$1,548
Gross margin37.0%
Markup on direct cost58.7%

Quote $10,317 to cover $6,500 of direct cost, recover $2,270 of overhead and leave $1,548 of net profit. That is a 58.7% markup on cost.

How sensitive the answer is

Holding everything else steady and changing only labour cost, this is what happens to price to quote. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.

Labour cost ($)Price to quote
$1,300 $8,254
$1,950 $9,286
$2,600 example above $10,317
$3,900 $12,381
$5,200 $14,444

Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.

What each figure means

Labour cost ($)
Burdened: wages plus tax, insurance and the vehicle, not the hourly wage.
Materials cost ($)
A money amount, starting at $3,900.
Other direct costs ($)
Permits, disposal, equipment hire, subcontractors.
Overhead rate (%)
Overhead as a share of revenue. Work it out from last year's accounts.
Target net margin (%)
A percentage, between 0 and 80, starting at 15%.

What the results tell you

ResultWhat it is
Price to quoteThe headline result. A money figure.
Direct costA money figure.
Overhead recoveredA money figure.
Net profitA money figure.
Gross marginA percentage.
Markup on direct costA percentage.

What this cannot see

Material quantities assume a clean rectangular plane and the waste factor you enter. Valleys, hips, dormers, penetrations and a steep pitch all raise real waste, and a tear-off frequently uncovers decking that was not in the quote.

Estimating is the easy part

The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.