Plumbing Route Efficiency Calculator

Work out how much of the working day is spent driving and what that costs across a year.

Your numbers

$
$
Wage plus burden.

Result

Billable share of the day 65.0%
Unbilled hours per month 185
Revenue those hours would have carried $24,948
What the unbilled hours cost in wages $6,283
65.0% of the paid day reaches an invoice. The rest is 185 hours a month, costing $6,283 in wages and carrying $24,948 of revenue that never happened.

Not all unbilled time is waste. Travel, restocking, training and warranty calls are necessary and will never be zero. The useful question is whether the share is drifting, not whether it reaches 100%.

Get a Free Business Audit

What moves the number

  • Jobs per day and the distance between them.
  • Whether the day is sequenced geographically or by booking order.
  • Vehicle cost per mile including maintenance and depreciation, not fuel alone.

Where this one goes wrong

Costing drive time at fuel only. Wages plus full vehicle cost plus the job that did not fit are several times the fuel figure.

Questions

About this calculator

How much drive time is normal?

It depends entirely on territory density, so compare against your own previous months rather than an industry figure from a different service area.

What reduces it most?

Clustering bookings by area rather than by the order they came in. Routing beats speed, because travel is the binding constraint on a service day.

Do wider appointment windows help?

Considerably, where customers accept them. Most routing inefficiency comes from promises about timing rather than from geography.

How useful was this calculator?

Not rated yet. Yours would be the first.

The formula

utilisation = billed hours / paid hours

Put this calculator on your site

Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.

Please keep the attribution line. It is the only thing we ask in return.

How to use this calculator

  1. Paid hours per day. Enter your own figure; the page starts at 8.
  2. Hours that reach an invoice. Enter your own figure; the page starts at 5.2.
  3. Number of technicians. Enter your own figure; the page starts at 3.
  4. Rate charged per hour ($). Enter your own figure; the page starts at $135.
  5. Cost per paid hour ($). Wage plus burden.
  6. Working days per month. Enter your own figure; the page starts at 22.

The result updates as you type, so you can try a figure, see what it does to billable share of the day, and change it back. Nothing you enter is sent anywhere or saved.

A worked example

These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.

What goes in

InputValue
Paid hours per day8
Hours that reach an invoice5.2
Number of technicians3
Rate charged per hour$135
Cost per paid hour$34
Working days per month22

What comes out

ResultValue
Billable share of the day main result65.0%
Unbilled hours per month185
Revenue those hours would have carried$24,948
What the unbilled hours cost in wages$6,283

65.0% of the paid day reaches an invoice. The rest is 185 hours a month, costing $6,283 in wages and carrying $24,948 of revenue that never happened.

How sensitive the answer is

Holding everything else steady and changing only rate charged per hour, this is what happens to billable share of the day. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.

Rate charged per hour ($)Billable share of the day
$68 65.0%
$101 65.0%
$135 example above 65.0%
$203 65.0%
$270 65.0%

Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.

What each figure means

Paid hours per day
A number, between 0 and 24, starting at 8.
Hours that reach an invoice
A number, between 0 and 24, starting at 5.2.
Number of technicians
A number, between 0 and 500, starting at 3.
Rate charged per hour ($)
A money amount, starting at $135.
Cost per paid hour ($)
Wage plus burden.
Working days per month
A number, between 0 and 31, starting at 22.

What the results tell you

ResultWhat it is
Billable share of the dayThe headline result. A percentage.
Unbilled hours per monthA number.
Revenue those hours would have carriedA money figure.
What the unbilled hours cost in wagesA money figure.

Before you rely on this number

Pipe sizing, flow and pressure figures depend on the actual fittings, the run, the material and local code. Code requirements vary by jurisdiction and override any general calculation, so check what applies where the work is happening.

Estimating is the easy part

The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.