Plumbing

Pricing Calculator

Set a price from full job cost and the margin you intend, rather than from a markup on materials.

Your numbers

$
Burdened: wages plus tax, insurance and the vehicle, not the hourly wage.
$
$
Permits, disposal, equipment hire, subcontractors.
%
Overhead as a share of revenue. Work it out from last year's accounts.
%

Result

Price to quote $603.17
Direct cost $380
Overhead recovered $132.70
Net profit $90.48
Gross margin 37.0%
Markup on direct cost 58.7%
Quote $603.17 to cover $380 of direct cost, recover $132.70 of overhead and leave $90.48 of net profit. That is a 58.7% markup on cost.

Overhead and margin are taken as shares of the selling price, which is why the cost is divided rather than multiplied. Adding 15% to cost does not produce a 15% margin. Gross profit is what is left after the cost of doing the job. Overhead comes out of that: the building, the office wages, the vans, insurance, software and advertising. A healthy gross margin still loses money if overhead is larger.

Get a Free Business Audit

What moves the number

  • Burdened labour including travel and any return visit.
  • Materials at landed cost.
  • Overhead recovered per job rather than hoped for.

Where this one goes wrong

Applying a margin target as a markup. A 40 percent markup is roughly a 29 percent margin, and pricing a year of work on that confusion is the most expensive arithmetic error in the trade.

Questions

About this calculator

Flat rate or hourly?

Flat rate gives the customer certainty and removes the argument about hours, provided the book was built from real times and real costs. Built from optimistic times it prices work below cost consistently.

How do I price a job I cannot fully see?

Price the access and the known work, state what is provisional, and agree in advance what happens if the scope changes. That is more honest than a fixed price on an unknown.

Should call-out be separate from labour?

Showing it separately makes the travel and diagnostic cost visible and defensible. Absorbed into an hourly rate it disappears and short jobs stop covering their trip.

How useful was this calculator?

Not rated yet. Yours would be the first.

The formula

price = direct cost / (1 - overhead% - margin%)

Put this calculator on your site

Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.

Please keep the attribution line. It is the only thing we ask in return.

How to use this calculator

  1. Labour cost ($). Burdened: wages plus tax, insurance and the vehicle, not the hourly wage.
  2. Materials cost ($). Enter your own figure; the page starts at $140.
  3. Other direct costs ($). Permits, disposal, equipment hire, subcontractors.
  4. Overhead rate (%). Overhead as a share of revenue. Work it out from last year's accounts.
  5. Target net margin (%). Enter your own figure; the page starts at 15%.

The result updates as you type, so you can try a figure, see what it does to price to quote, and change it back. Nothing you enter is sent anywhere or saved.

A worked example

These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.

What goes in

InputValue
Labour cost$240
Materials cost$140
Other direct costs$0
Overhead rate22%
Target net margin15%

What comes out

ResultValue
Price to quote main result$603.17
Direct cost$380
Overhead recovered$132.70
Net profit$90.48
Gross margin37.0%
Markup on direct cost58.7%

Quote $603.17 to cover $380 of direct cost, recover $132.70 of overhead and leave $90.48 of net profit. That is a 58.7% markup on cost.

How sensitive the answer is

Holding everything else steady and changing only labour cost, this is what happens to price to quote. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.

Labour cost ($)Price to quote
$120 $412.70
$180 $507.94
$240 example above $603.17
$360 $793.65
$480 $984.13

Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.

What each figure means

Labour cost ($)
Burdened: wages plus tax, insurance and the vehicle, not the hourly wage.
Materials cost ($)
A money amount, starting at $140.
Other direct costs ($)
Permits, disposal, equipment hire, subcontractors.
Overhead rate (%)
Overhead as a share of revenue. Work it out from last year's accounts.
Target net margin (%)
A percentage, between 0 and 80, starting at 15%.

What the results tell you

ResultWhat it is
Price to quoteThe headline result. A money figure.
Direct costA money figure.
Overhead recoveredA money figure.
Net profitA money figure.
Gross marginA percentage.
Markup on direct costA percentage.

Before you rely on this number

Pipe sizing, flow and pressure figures depend on the actual fittings, the run, the material and local code. Code requirements vary by jurisdiction and override any general calculation, so check what applies where the work is happening.