Moving & storage
Piano Moving Cost Calculator
Prices piano moving, where weight and shape make it specialist work rather than careful lifting.
Result
A planning estimate, not a quote. Access, the age of the equipment, what is found once it is opened up and local labour rates all move the real figure, sometimes a long way.
Get a Free Business AuditHow the calculation works
Hours times crew times rate, plus materials and the call-out, at a rate reflecting specialist equipment and crew size. A piano is heavy, top-heavy, awkwardly shaped and expensive, which is why it is priced separately from furniture rather than as a large item. An upright is a substantial weight concentrated on casters that will not take it; a grand has to be partly dismantled, with the legs and pedal lyre removed and the body moved on its side on a padded skid board. Both need more people than their footprint suggests.
What moves the number
- Upright against grand, since a grand is dismantled and skidded rather than wheeled.
- Stairs, which are the dominant factor and sometimes rule out a route entirely.
- Turns, doorway widths and landing space on the route.
- Whether tuning after the move is included, which it should be expected to need.
Where this one goes wrong
Walk the route before committing. Stairs with a tight turn, a narrow doorway or a landing with no room to pivot can make a piano impossible to move by that path, and discovering it with the instrument partway is both dangerous and expensive. Where there is no route, hoisting through a window is a specialist operation rather than an alternative method. On expectations, a piano will almost always need tuning after a move because the frame and strings respond to handling and to a change in humidity and temperature, so that is a normal consequence rather than evidence of damage.
Before you quote
- Walk the full route for stair turns, doorway widths and landing space.
- Confirm crew size and equipment for the instrument type.
- Tell the customer to expect tuning after the move.
Questions
About this calculator
Why does moving a piano cost so much?
Because it is a specialist job rather than a heavy lift. The weight is concentrated and top-heavy, a grand has to be partly dismantled and moved on a padded skid, and it takes more people and purpose-made equipment. The instrument is also valuable, which raises the consequence of getting it wrong.
Can a piano go up any staircase?
No. Tight turns, narrow doorways and landings without pivot room can make a route impossible, and that has to be established by walking it before the instrument is lifted. Where no route exists, hoisting through an opening is a separate specialist operation rather than a fallback.
Will my piano need tuning after moving?
Almost certainly, and it is normal rather than a sign of damage. Handling, and the change in humidity and temperature at the new location, both affect the frame and strings. It is worth allowing the instrument time to settle in the new environment before tuning.
The formula
total = hours x people x rate + parts + call-out, then sales tax
Put this calculator on your site
Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.
Please keep the attribution line. It is the only thing we ask in return.
How to use this calculator
- Hours on site (h). Enter your own figure; the page starts at 6 h.
- People needed. Enter your own figure; the page starts at 1.
- Labour rate charged ($). Enter your own figure; the page starts at $165.
- Parts and materials ($). Enter your own figure; the page starts at $90.
- Call-out or diagnostic fee ($). Enter your own figure; the page starts at $95.
- Sales tax (%). Leave at zero if you are quoting before tax.
The result updates as you type, so you can try a figure, see what it does to estimated total, and change it back. Nothing you enter is sent anywhere or saved.
A worked example
These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.
What goes in
| Input | Value |
|---|---|
| Hours on site | 6 h |
| People needed | 1 |
| Labour rate charged | $165 |
| Parts and materials | $90 |
| Call-out or diagnostic fee | $95 |
| Sales tax | 0% |
What comes out
| Result | Value |
|---|---|
| Estimated total main result | $1,175 |
| Labour | $990 |
| Before tax | $1,175 |
| Sales tax | $0 |
About $1,175: $990 of labour, $90 of parts and a $95 call-out.
How sensitive the answer is
Holding everything else steady and changing only labour rate charged, this is what happens to estimated total. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.
| Labour rate charged ($) | Estimated total |
|---|---|
| $83 | $683 |
| $124 | $929 |
| $165 example above | $1,175 |
| $248 | $1,673 |
| $330 | $2,165 |
Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.
What each figure means
- Hours on site (h)
- Measured in h, between 0 and 400, starting at 6 h.
- People needed
- A number, between 0 and 40, starting at 1.
- Labour rate charged ($)
- A money amount, starting at $165.
- Parts and materials ($)
- A money amount, starting at $90.
- Call-out or diagnostic fee ($)
- A money amount, starting at $95.
- Sales tax (%)
- Leave at zero if you are quoting before tax.
What the results tell you
| Result | What it is |
|---|---|
| Estimated total | The headline result. A money figure. |
| Labour | A money figure. |
| Before tax | A money figure. |
| Sales tax | A money figure. |
Estimating is the easy part
The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.