Build a panel-work allowance from a defined replacement scope, including crew attendance and the equipment being supplied.
Result
A planning estimate, not a quote. Access, the age of the equipment, what is found once it is opened up and local labour rates all move the real figure, sometimes a long way.
Get a Free Business AuditWhat moves the number
- Distinguish replacing the enclosure from changing the service capacity.
- Allow for circuit identification and reconnecting the existing installation.
- Account for shutdown coordination, access and any required return attendance.
Where this one goes wrong
A panel replacement does not automatically increase the utility supply or resolve every existing wiring defect. Scope discoveries separately. Keeping a serviceable panel, repairing a specific defect or managing added load may be legitimate alternatives to replacement.
Questions
About this calculator
What belongs in the materials entry?
Use the selected assembly and its required compatible components. An enclosure-only purchase price leaves out parts needed to complete the actual scope.
Are utility and inspection arrangements included?
Only if their costs and attendance are included in your inputs. Identify which party arranges each step before promising a completion date.
Can this decide the new panel capacity?
No. It is a pricing worksheet. Service and panel sizing require a separate code-governed planning check followed by the local design, utility and equipment requirements.
The formula
total = hours x people x rate + parts + call-out, then sales tax
Put this calculator on your site
Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.
Please keep the attribution line. It is the only thing we ask in return.
How to use this calculator
- Hours on site (h). Enter your own figure; the page starts at 3 h.
- People needed. Enter your own figure; the page starts at 1.
- Labour rate charged ($). Enter your own figure; the page starts at $130.
- Parts and materials ($). Enter your own figure; the page starts at $175.
- Call-out or diagnostic fee ($). Enter your own figure; the page starts at $95.
- Sales tax (%). Leave at zero if you are quoting before tax.
The result updates as you type, so you can try a figure, see what it does to estimated total, and change it back. Nothing you enter is sent anywhere or saved.
A worked example
These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.
What goes in
| Input | Value |
|---|---|
| Hours on site | 3 h |
| People needed | 1 |
| Labour rate charged | $130 |
| Parts and materials | $175 |
| Call-out or diagnostic fee | $95 |
| Sales tax | 0% |
What comes out
| Result | Value |
|---|---|
| Estimated total main result | $660 |
| Labour | $390 |
| Before tax | $660 |
| Sales tax | $0 |
About $660: $390 of labour, $175 of parts and a $95 call-out.
How sensitive the answer is
Holding everything else steady and changing only labour rate charged, this is what happens to estimated total. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.
| Labour rate charged ($) | Estimated total |
|---|---|
| $65 | $465 |
| $98 | $564 |
| $130 example above | $660 |
| $195 | $855 |
| $260 | $1,050 |
Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.
What each figure means
- Hours on site (h)
- Measured in h, between 0 and 400, starting at 3 h.
- People needed
- A number, between 0 and 40, starting at 1.
- Labour rate charged ($)
- A money amount, starting at $130.
- Parts and materials ($)
- A money amount, starting at $175.
- Call-out or diagnostic fee ($)
- A money amount, starting at $95.
- Sales tax (%)
- Leave at zero if you are quoting before tax.
What the results tell you
| Result | What it is |
|---|---|
| Estimated total | The headline result. A money figure. |
| Labour | A money figure. |
| Before tax | A money figure. |
| Sales tax | A money figure. |
Before you rely on this number
Conductor sizing, voltage drop and load figures are governed by code, and the code takes precedence over any calculator. Ambient temperature, conduit fill, continuous load factors and the specific installation all change the answer. Treat this as a first pass, not a design.
Estimating is the easy part
The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.