bdevy.

Auto repair & detailing

Mobile Detailing Pricing Calculator

Price mobile detailing from the working hours a day genuinely contains once travel and setup are removed.

Your numbers

$
Burdened: wages plus tax, insurance and the vehicle, not the hourly wage.
$
$
Permits, disposal, equipment hire, subcontractors.
%
Overhead as a share of revenue. Work it out from last year's accounts.
%

Result

Price to quote $666.67
Direct cost $420
Overhead recovered $146.67
Net profit $100.00
Gross margin 37.0%
Markup on direct cost 58.7%
Quote $666.67 to cover $420 of direct cost, recover $146.67 of overhead and leave $100.00 of net profit. That is a 58.7% markup on cost.

Overhead and margin are taken as shares of the selling price, which is why the cost is divided rather than multiplied. Adding 15% to cost does not produce a 15% margin. Gross profit is what is left after the cost of doing the job. Overhead comes out of that: the building, the office wages, the vans, insurance, software and advertising. A healthy gross margin still loses money if overhead is larger.

Get a Free Business Audit

What moves the number

  • Travel time between jobs, which is paid and unbillable and caps the day.
  • Setup and pack down at every stop, which a fixed site pays once.
  • Water and power availability on site, since carrying your own limits how many vehicles a tank covers.

Where this one goes wrong

Pricing per vehicle as though the day held as many jobs as the working hours suggest. Three jobs spread across a city can fill a day that would have held five in one location, and the price has to reflect the day rather than the vehicle.

Questions

About this calculator

Should mobile detailing charge a travel fee?

Either a call-out fee or a minimum job value, but travel should not be absorbed silently. It is the single largest difference between mobile and fixed-site economics.

How do I fit more jobs into a day?

Cluster by area rather than by booking order, and set a minimum job value that makes an isolated booking worth the drive. Routing beats speed for a mobile operation.

What if the site has no water or power?

Decide the policy before booking and state it. Arriving to find no supply means either an unplanned tank job or a wasted trip, and both are avoidable with one question.

How useful was this calculator?

Not rated yet. Yours would be the first.

The formula

price = direct cost / (1 - overhead% - margin%)

Put this calculator on your site

Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.

Please keep the attribution line. It is the only thing we ask in return.

How to use this calculator

  1. Labour cost ($). Burdened: wages plus tax, insurance and the vehicle, not the hourly wage.
  2. Materials cost ($). Enter your own figure; the page starts at $180.
  3. Other direct costs ($). Permits, disposal, equipment hire, subcontractors.
  4. Overhead rate (%). Overhead as a share of revenue. Work it out from last year's accounts.
  5. Target net margin (%). Enter your own figure; the page starts at 15%.

The result updates as you type, so you can try a figure, see what it does to price to quote, and change it back. Nothing you enter is sent anywhere or saved.

A worked example

These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.

What goes in

InputValue
Labour cost$240
Materials cost$180
Other direct costs$0
Overhead rate22%
Target net margin15%

What comes out

ResultValue
Price to quote main result$666.67
Direct cost$420
Overhead recovered$146.67
Net profit$100.00
Gross margin37.0%
Markup on direct cost58.7%

Quote $666.67 to cover $420 of direct cost, recover $146.67 of overhead and leave $100.00 of net profit. That is a 58.7% markup on cost.

How sensitive the answer is

Holding everything else steady and changing only labour cost, this is what happens to price to quote. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.

Labour cost ($)Price to quote
$120 $476.19
$180 $571.43
$240 example above $666.67
$360 $857.14
$480 $1,048

Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.

What each figure means

Labour cost ($)
Burdened: wages plus tax, insurance and the vehicle, not the hourly wage.
Materials cost ($)
A money amount, starting at $180.
Other direct costs ($)
Permits, disposal, equipment hire, subcontractors.
Overhead rate (%)
Overhead as a share of revenue. Work it out from last year's accounts.
Target net margin (%)
A percentage, between 0 and 80, starting at 15%.

What the results tell you

ResultWhat it is
Price to quoteThe headline result. A money figure.
Direct costA money figure.
Overhead recoveredA money figure.
Net profitA money figure.
Gross marginA percentage.
Markup on direct costA percentage.

Estimating is the easy part

The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.