Landscaping
Patio Cost Calculator
Price a patio from excavation, base, bedding, paving and the edge and drainage details.
Result
A planning estimate, not a quote. Access, the age of the equipment, what is found once it is opened up and local labour rates all move the real figure, sometimes a long way.
Get a Free Business AuditWhat moves the number
- Excavation and spoil removal, which is the hidden bulk of the job.
- Base depth, which is set by ground conditions and use.
- Falls and drainage, since a patio that holds water is a failed patio.
Where this one goes wrong
Pricing from the paving material. Excavation, spoil disposal, sub-base and bedding usually exceed the cost of the pavers, and a quote built on the visible material will not cover the work.
Questions
About this calculator
Where does patio cost actually go?
Mostly into what is not visible: excavation, spoil removal and base. The paving is the part the customer sees and frequently the smaller share of the cost.
What about spoil disposal?
It is a real and often substantial cost. Excavating a patio produces a large volume of material that has to leave the site, and skip or grab hire belongs in the quote.
How much fall does a patio need?
Enough to shed water away from the building, set before laying rather than corrected after. A flat patio ponds and stains, and correcting it means lifting it.
The formula
total = hours x people x rate + parts + call-out, then sales tax
Put this calculator on your site
Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.
Please keep the attribution line. It is the only thing we ask in return.
How to use this calculator
- Hours on site (h). Enter your own figure; the page starts at 3.5 h.
- People needed. Enter your own figure; the page starts at 1.
- Labour rate charged ($). Enter your own figure; the page starts at $72.
- Parts and materials ($). Enter your own figure; the page starts at $95.
- Call-out or diagnostic fee ($). Enter your own figure; the page starts at $95.
- Sales tax (%). Leave at zero if you are quoting before tax.
The result updates as you type, so you can try a figure, see what it does to estimated total, and change it back. Nothing you enter is sent anywhere or saved.
A worked example
These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.
What goes in
| Input | Value |
|---|---|
| Hours on site | 3.5 h |
| People needed | 1 |
| Labour rate charged | $72 |
| Parts and materials | $95 |
| Call-out or diagnostic fee | $95 |
| Sales tax | 0% |
What comes out
| Result | Value |
|---|---|
| Estimated total main result | $442 |
| Labour | $252 |
| Before tax | $442 |
| Sales tax | $0 |
About $442: $252 of labour, $95 of parts and a $95 call-out.
How sensitive the answer is
Holding everything else steady and changing only labour rate charged, this is what happens to estimated total. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.
| Labour rate charged ($) | Estimated total |
|---|---|
| $36 | $316 |
| $54 | $379 |
| $72 example above | $442 |
| $108 | $568 |
| $144 | $694 |
Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.
What each figure means
- Hours on site (h)
- Measured in h, between 0 and 400, starting at 3.5 h.
- People needed
- A number, between 0 and 40, starting at 1.
- Labour rate charged ($)
- A money amount, starting at $72.
- Parts and materials ($)
- A money amount, starting at $95.
- Call-out or diagnostic fee ($)
- A money amount, starting at $95.
- Sales tax (%)
- Leave at zero if you are quoting before tax.
What the results tell you
| Result | What it is |
|---|---|
| Estimated total | The headline result. A money figure. |
| Labour | A money figure. |
| Before tax | A money figure. |
| Sales tax | A money figure. |
Seasonality is not in this
Coverage and material figures assume the area you enter. Slope, access for machinery, existing growth and the time of year all affect both quantity and labour, and none of them appear in a calculation like this.
Estimating is the easy part
The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.