A planning estimate, not a quote. Access, the age of the equipment, what is found once it is opened up and local labour rates all move the real figure, sometimes a long way.
Get a Free Business AuditHow the calculation works
Hours times crew times rate, plus disposal and the call-out. Estimating this work well is mostly about classifying rather than measuring. Volume sets the truck fraction and therefore the headline price, but the things that move the actual cost are weight, whether anything needs special handling, and how far it has to be carried. A quote built from a photograph is a volume guess with none of those three established, which is why photo estimates are given as ranges and confirmed on site.
What moves the number
- Whether the estimate came from a photo, a description or a site visit.
- Dense materials in the load, which change the disposal basis.
- Access, stairs and carry distance.
- Items requiring separate facilities, which add a trip rather than a fee.
Where this one goes wrong
Ask the questions a photograph cannot answer: is there a fridge or an air conditioner in it, is there paint or chemicals, is any of it concrete or soil, and where is the truck going to park. Each of those changes the number materially and none are visible in an image. Quoting a firm price from a photo and then revising on arrival is the complaint this industry attracts, so giving a clear range with the conditions that move it is both more honest and easier to hold. On site, walk the carry route rather than just looking at the pile.
Before you quote
- Ask specifically about appliances, chemicals and dense materials.
- Establish where the truck can park and what the carry route is.
- Give a range with named conditions rather than a firm photo price.
Questions
About this calculator
Can junk removal be quoted from photos?
As a range, usefully. As a firm price, not reliably, because a photo does not show weight, whether there are appliances or chemicals, or how far the load has to be carried. Any of those changes the cost, which is why photo quotes are confirmed on arrival.
What should I tell the company before they arrive?
Whether there are any appliances with refrigerant, any paint, chemicals, fuel or batteries, anything heavy such as concrete or soil, which floor it is on, and where a truck can park. Those four answers largely determine the price and the crew needed.
Why did the price change when they arrived?
Usually because something was in the load that the estimate did not account for: heavier material than described, an appliance needing special handling, chemicals that need a different facility, or a carry that is much longer than assumed. A quote given as a range with conditions avoids the surprise.
The formula
total = hours x people x rate + parts + call-out, then sales tax
Put this calculator on your site
Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.
Please keep the attribution line. It is the only thing we ask in return.
How to use this calculator
- Hours on site (h). Enter your own figure; the page starts at 1.8 h.
- People needed. Enter your own figure; the page starts at 1.
- Labour rate charged ($). Enter your own figure; the page starts at $90.
- Parts and materials ($). Enter your own figure; the page starts at $0.
- Call-out or diagnostic fee ($). Enter your own figure; the page starts at $95.
- Sales tax (%). Leave at zero if you are quoting before tax.
The result updates as you type, so you can try a figure, see what it does to estimated total, and change it back. Nothing you enter is sent anywhere or saved.
A worked example
These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.
What goes in
| Input | Value |
|---|---|
| Hours on site | 1.8 h |
| People needed | 1 |
| Labour rate charged | $90 |
| Parts and materials | $0 |
| Call-out or diagnostic fee | $95 |
| Sales tax | 0% |
What comes out
| Result | Value |
|---|---|
| Estimated total main result | $257 |
| Labour | $162 |
| Before tax | $257 |
| Sales tax | $0 |
About $257: $162 of labour, $0 of parts and a $95 call-out.
How sensitive the answer is
Holding everything else steady and changing only labour rate charged, this is what happens to estimated total. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.
| Labour rate charged ($) | Estimated total |
|---|---|
| $45 | $176 |
| $68 | $217.40 |
| $90 example above | $257 |
| $135 | $338 |
| $180 | $419 |
Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.
What each figure means
- Hours on site (h)
- Measured in h, between 0 and 400, starting at 1.8 h.
- People needed
- A number, between 0 and 40, starting at 1.
- Labour rate charged ($)
- A money amount, starting at $90.
- Parts and materials ($)
- A money amount, starting at $0.
- Call-out or diagnostic fee ($)
- A money amount, starting at $95.
- Sales tax (%)
- Leave at zero if you are quoting before tax.
What the results tell you
| Result | What it is |
|---|---|
| Estimated total | The headline result. A money figure. |
| Labour | A money figure. |
| Before tax | A money figure. |
| Sales tax | A money figure. |
Estimating is the easy part
The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.