bdevy.

Landscaping

Irrigation Cost Calculator

Price an irrigation installation from zones, heads, trenching and the controller.

Your numbers

h
$
$
$
%
Leave at zero if you are quoting before tax.

Result

Estimated total $442
Labour $252
Before tax $442
Sales tax $0
About $442: $252 of labour, $95 of parts and a $95 call-out.

A planning estimate, not a quote. Access, the age of the equipment, what is found once it is opened up and local labour rates all move the real figure, sometimes a long way.

Get a Free Business Audit

What moves the number

  • Trenching, which is most of the labour and depends entirely on ground conditions.
  • Zone count, which drives valves, wiring and controller size.
  • Whether the ground is open or the lawn is established and must be reinstated.

Where this one goes wrong

Quoting an irrigation retrofit at new-build rates. Installing into an established lawn means trenching through turf and making good afterwards, which is substantially more labour than pipework on open ground.

Questions

About this calculator

Why is retrofitting more expensive?

Because the trenching goes through an existing lawn that has to be reinstated. On open ground before turfing, the same pipework is a fraction of the labour.

What drives the price most?

Ground conditions. Rocky or root-filled ground can multiply the trenching time, and it is not visible before the first cut.

Is a smart controller worth it?

It can reduce water use by adjusting to weather rather than running a fixed schedule. Whether it pays depends on local water pricing and the size of the system.

How useful was this calculator?

Not rated yet. Yours would be the first.

The formula

total = hours x people x rate + parts + call-out, then sales tax

Put this calculator on your site

Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.

Please keep the attribution line. It is the only thing we ask in return.

How to use this calculator

  1. Hours on site (h). Enter your own figure; the page starts at 3.5 h.
  2. People needed. Enter your own figure; the page starts at 1.
  3. Labour rate charged ($). Enter your own figure; the page starts at $72.
  4. Parts and materials ($). Enter your own figure; the page starts at $95.
  5. Call-out or diagnostic fee ($). Enter your own figure; the page starts at $95.
  6. Sales tax (%). Leave at zero if you are quoting before tax.

The result updates as you type, so you can try a figure, see what it does to estimated total, and change it back. Nothing you enter is sent anywhere or saved.

A worked example

These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.

What goes in

InputValue
Hours on site3.5 h
People needed1
Labour rate charged$72
Parts and materials$95
Call-out or diagnostic fee$95
Sales tax0%

What comes out

ResultValue
Estimated total main result$442
Labour$252
Before tax$442
Sales tax$0

About $442: $252 of labour, $95 of parts and a $95 call-out.

How sensitive the answer is

Holding everything else steady and changing only labour rate charged, this is what happens to estimated total. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.

Labour rate charged ($)Estimated total
$36 $316
$54 $379
$72 example above $442
$108 $568
$144 $694

Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.

What each figure means

Hours on site (h)
Measured in h, between 0 and 400, starting at 3.5 h.
People needed
A number, between 0 and 40, starting at 1.
Labour rate charged ($)
A money amount, starting at $72.
Parts and materials ($)
A money amount, starting at $95.
Call-out or diagnostic fee ($)
A money amount, starting at $95.
Sales tax (%)
Leave at zero if you are quoting before tax.

What the results tell you

ResultWhat it is
Estimated totalThe headline result. A money figure.
LabourA money figure.
Before taxA money figure.
Sales taxA money figure.

Seasonality is not in this

Coverage and material figures assume the area you enter. Slope, access for machinery, existing growth and the time of year all affect both quantity and labour, and none of them appear in a calculation like this.

Estimating is the easy part

The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.