Footing Calculator

Concrete for a strip footing, from its width, depth and total run.

Your numbers

ft
in
in
%
$

Result

Cubic yards to order 4.5
Net volume 4.0 Cubic yards
Concrete per linear foot 0.9 Cubic feet
Estimated cost $742.50
A 16 by 8 inch footing running 120 feet takes 4.5 cubic yards, about $742.50.

Footing size is a structural decision set by the load above, the soil bearing capacity and the frost depth where you are building. This works out the concrete for a footing that has already been specified. Over-excavation is the usual reason the real pour exceeds the calculated volume, which is why the waste allowance matters more on footings than on slabs.

Get a Free Business Audit

Questions

About this calculator

How deep does a footing need to be?

Below the frost line at minimum, which varies from a few inches in the south to four feet or more in cold climates, and deep enough to reach soil that can carry the load. Local code sets both.

Why is my actual pour always more than calculated?

Because trenches are rarely the size they were meant to be. Soft spots, collapsed sides and over-digging all add volume, and none of them show up in the arithmetic.

The formula

volume = (width/12) x (depth/12) x length / 27

Put this calculator on your site

Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.

Please keep the attribution line. It is the only thing we ask in return.

Estimating is the easy part

The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.