bdevy.

Fencing & decking

Fence Installation Cost Calculator

Prices a fence installation, where the ground decides the labour and the paperwork decides the schedule.

Your numbers

h
$
$
$
%
Leave at zero if you are quoting before tax.

Result

Estimated total $3,655
Labour $1,560
Before tax $3,655
Sales tax $0
About $3,655: $1,560 of labour, $2,000 of parts and a $95 call-out.

A planning estimate, not a quote. Access, the age of the equipment, what is found once it is opened up and local labour rates all move the real figure, sometimes a long way.

Get a Free Business Audit

How the calculation works

Hours times crew times rate, plus materials and the call-out. The hours are driven by the holes rather than the fence: digging is the slow part, and it varies from straightforward in loose soil to a genuine problem in rock, hardpan or heavy clay. A run that an auger walks through in a morning can take two days if the ground fights back. The estimate should say which assumption it is built on, because rock is not a rare surprise in many areas and absorbing it is expensive.

What moves the number

  • Soil and ground conditions, which is the largest variable in the labour.
  • Access for an auger or a mini digger, since hand digging a run is a different job entirely.
  • Whether old fence removal and disposal are in scope.
  • Permit and utility locate timing, which set the calendar rather than the hours.

Where this one goes wrong

Build the utility locate into the schedule rather than treating it as a formality: it takes days to arrange, it is required, and digging without it risks striking a gas or electrical service. Removing an old fence is the other item that gets underquoted, because old posts set in concrete are slow to extract and the debris is bulky waste with a disposal cost. State whether removal is included. It is also worth confirming permits and any community restrictions before material is ordered, since a fence built to the wrong height or of the wrong material may have to come down, and that is a total loss rather than a variation.

Before you quote

  • Arrange the utility locate before scheduling the dig.
  • Quote old fence removal and disposal explicitly, in or out.
  • Confirm permit, height and material restrictions before ordering.

Where the rules come from

Questions

About this calculator

What makes one fence installation cost more than another?

The ground, mostly. Digging is the slow part of the job, and soil that an auger handles easily versus rock, hardpan or heavy clay can double the labour on the same length of fence. Access for machinery is the other big one, since hand digging a run of holes is far slower.

Is removing the old fence included?

It should be stated either way, because it is real work. Old posts set in concrete are slow to get out, and the debris is bulky waste with a disposal cost. It is a common source of disagreement when a quote is silent on it.

How long before work can start?

The utility locate takes a few days and is required before any digging, and a permit if one is needed adds its own time. Those set the earliest start rather than crew availability, which is worth explaining to a customer expecting work to begin immediately.

How useful was this calculator?

Not rated yet. Yours would be the first.

The formula

total = hours x people x rate + parts + call-out, then sales tax

Put this calculator on your site

Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.

Please keep the attribution line. It is the only thing we ask in return.

How to use this calculator

  1. Hours on site (h). Enter your own figure; the page starts at 20 h.
  2. People needed. Enter your own figure; the page starts at 1.
  3. Labour rate charged ($). Enter your own figure; the page starts at $78.
  4. Parts and materials ($). Enter your own figure; the page starts at $2,000.
  5. Call-out or diagnostic fee ($). Enter your own figure; the page starts at $95.
  6. Sales tax (%). Leave at zero if you are quoting before tax.

The result updates as you type, so you can try a figure, see what it does to estimated total, and change it back. Nothing you enter is sent anywhere or saved.

A worked example

These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.

What goes in

InputValue
Hours on site20 h
People needed1
Labour rate charged$78
Parts and materials$2,000
Call-out or diagnostic fee$95
Sales tax0%

What comes out

ResultValue
Estimated total main result$3,655
Labour$1,560
Before tax$3,655
Sales tax$0

About $3,655: $1,560 of labour, $2,000 of parts and a $95 call-out.

How sensitive the answer is

Holding everything else steady and changing only labour rate charged, this is what happens to estimated total. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.

Labour rate charged ($)Estimated total
$39 $2,875
$59 $3,275
$78 example above $3,655
$117 $4,435
$156 $5,215

Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.

What each figure means

Hours on site (h)
Measured in h, between 0 and 400, starting at 20 h.
People needed
A number, between 0 and 40, starting at 1.
Labour rate charged ($)
A money amount, starting at $78.
Parts and materials ($)
A money amount, starting at $2,000.
Call-out or diagnostic fee ($)
A money amount, starting at $95.
Sales tax (%)
Leave at zero if you are quoting before tax.

What the results tell you

ResultWhat it is
Estimated totalThe headline result. A money figure.
LabourA money figure.
Before taxA money figure.
Sales taxA money figure.

Estimating is the easy part

The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.