bdevy.

Electrical

Electrical Overhead Rate Calculator

Translate an electrical company's overhead budget into a share of revenue for pricing and scenario comparisons.

Your numbers

$
$
$
$
$
$
$
$

Result

Overhead per month $12,950
Overhead per year $155,400
Overhead rate 37.5% As a share of revenue
Cost of opening the doors $588.64 Per working day
Overhead runs $12,950 a month, 37.5% of revenue. Every working day costs $588.64 before anybody turns a wheel.

Overhead is what the business costs whether or not you work. Wages for people who are on jobs belong in job cost instead, and counting them here overstates overhead and underprices everything.

Get a Free Business Audit

What moves the number

  • The same overhead produces a higher rate when revenue falls.
  • Revenue and overhead must cover matching periods.
  • A rate for pricing should reflect a credible workload, not only the busiest month.

Where this one goes wrong

A lower percentage can result from large pass-through equipment sales rather than better overhead control. Review the cost total and revenue mix together before reducing the allowance used in quotations.

Questions

About this calculator

Can I carry last year's rate into every quote?

Use it as a reference and test changes in staffing, rent and achievable sales. An outdated denominator can under-recover today's support costs.

Is this a labour-hour overhead rate?

No. The percentage is measured against revenue. Recovering overhead per billable hour requires a separate estimate of productive hours and a compatible pricing method.

Why does the result move after a quiet month?

Fixed commitments remain while the revenue denominator shrinks. Compare several representative periods before treating one monthly percentage as a permanent operating rate.

How useful was this calculator?

Not rated yet. Yours would be the first.

The formula

overhead rate = monthly overhead / monthly revenue

Put this calculator on your site

Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.

Please keep the attribution line. It is the only thing we ask in return.

How to use this calculator

  1. Premises per month ($). Enter your own figure; the page starts at $1,800.
  2. Office and management wages ($). Enter your own figure; the page starts at $5,200.
  3. Vehicles, fuel and maintenance ($). Enter your own figure; the page starts at $2,400.
  4. Insurance and licensing ($). Enter your own figure; the page starts at $900.
  5. Software, phones and internet ($). Enter your own figure; the page starts at $450.
  6. Marketing and advertising ($). Enter your own figure; the page starts at $1,500.

The result updates as you type, so you can try a figure, see what it does to overhead per month, and change it back. Nothing you enter is sent anywhere or saved.

A worked example

These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.

What goes in

InputValue
Premises per month$1,800
Office and management wages$5,200
Vehicles, fuel and maintenance$2,400
Insurance and licensing$900
Software, phones and internet$450
Marketing and advertising$1,500
Everything else$700
Monthly revenue$34,500

What comes out

ResultValue
Overhead per month main result$12,950
Overhead per year$155,400
Overhead rate37.5%
Cost of opening the doors$588.64

Overhead runs $12,950 a month, 37.5% of revenue. Every working day costs $588.64 before anybody turns a wheel.

How sensitive the answer is

Holding everything else steady and changing only premises per month, this is what happens to overhead per month. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.

Premises per month ($)Overhead per month
$900 $12,050
$1,350 $12,500
$1,800 example above $12,950
$2,700 $13,850
$3,600 $14,750

Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.

What each figure means

Premises per month ($)
A money amount, starting at $1,800.
Office and management wages ($)
A money amount, starting at $5,200.
Vehicles, fuel and maintenance ($)
A money amount, starting at $2,400.
Insurance and licensing ($)
A money amount, starting at $900.
Software, phones and internet ($)
A money amount, starting at $450.
Marketing and advertising ($)
A money amount, starting at $1,500.
Everything else ($)
A money amount, starting at $700.
Monthly revenue ($)
A money amount, starting at $34,500.

What the results tell you

ResultWhat it is
Overhead per monthThe headline result. A money figure.
Overhead per yearA money figure.
Overhead rateA percentage.
Cost of opening the doorsA money figure.

Before you rely on this number

Conductor sizing, voltage drop and load figures are governed by code, and the code takes precedence over any calculator. Ambient temperature, conduit fill, continuous load factors and the specific installation all change the answer. Treat this as a first pass, not a design.

Estimating is the easy part

The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.