bdevy.

Electrical

Electrical Dispatch Efficiency Calculator

Value billed-time gaps in an electrical service team before reviewing appointment assignment and job readiness.

Your numbers

$
$
Wage plus burden.

Result

Billable share of the day 65.0%
Unbilled hours per month 185
Revenue those hours would have carried $24,024
What the unbilled hours cost in wages $6,283
65.0% of the paid day reaches an invoice. The rest is 185 hours a month, costing $6,283 in wages and carrying $24,024 of revenue that never happened.

Not all unbilled time is waste. Travel, restocking, training and warranty calls are necessary and will never be zero. The useful question is whether the share is drifting, not whether it reaches 100%.

Get a Free Business Audit

What moves the number

  • Count paid time consistently across dispatched technicians.
  • Billed hours depend on whether appointments can proceed as scheduled.
  • Team size and working days determine how repeated small delays accumulate.

Where this one goes wrong

The calculator does not assign jobs or evaluate electrician qualifications. Use it to value a documented change in billed time, then trace delays to incomplete booking notes, missing parts, inaccessible sites or unsuitable assignments.

Questions

About this calculator

Does a higher percentage prove dispatch improved?

Check the job mix and recording method first. A week of long installations can raise billed hours without any improvement in service-call assignment.

What should the dispatcher record alongside hours?

Capture why jobs were deferred or required another technician. Those causes distinguish appointment-readiness problems from unavoidable inspection and customer delays.

Can all the displayed lost revenue be recovered?

No. It assumes the time could be sold at the entered rate. Suitable demand, travel windows and the available skill mix determine what portion can become actual work.

How useful was this calculator?

Not rated yet. Yours would be the first.

The formula

utilisation = billed hours / paid hours

Put this calculator on your site

Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.

Please keep the attribution line. It is the only thing we ask in return.

How to use this calculator

  1. Paid hours per day. Enter your own figure; the page starts at 8.
  2. Hours that reach an invoice. Enter your own figure; the page starts at 5.2.
  3. Number of technicians. Enter your own figure; the page starts at 3.
  4. Rate charged per hour ($). Enter your own figure; the page starts at $130.
  5. Cost per paid hour ($). Wage plus burden.
  6. Working days per month. Enter your own figure; the page starts at 22.

The result updates as you type, so you can try a figure, see what it does to billable share of the day, and change it back. Nothing you enter is sent anywhere or saved.

A worked example

These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.

What goes in

InputValue
Paid hours per day8
Hours that reach an invoice5.2
Number of technicians3
Rate charged per hour$130
Cost per paid hour$34
Working days per month22

What comes out

ResultValue
Billable share of the day main result65.0%
Unbilled hours per month185
Revenue those hours would have carried$24,024
What the unbilled hours cost in wages$6,283

65.0% of the paid day reaches an invoice. The rest is 185 hours a month, costing $6,283 in wages and carrying $24,024 of revenue that never happened.

How sensitive the answer is

Holding everything else steady and changing only rate charged per hour, this is what happens to billable share of the day. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.

Rate charged per hour ($)Billable share of the day
$65 65.0%
$98 65.0%
$130 example above 65.0%
$195 65.0%
$260 65.0%

Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.

What each figure means

Paid hours per day
A number, between 0 and 24, starting at 8.
Hours that reach an invoice
A number, between 0 and 24, starting at 5.2.
Number of technicians
A number, between 0 and 500, starting at 3.
Rate charged per hour ($)
A money amount, starting at $130.
Cost per paid hour ($)
Wage plus burden.
Working days per month
A number, between 0 and 31, starting at 22.

What the results tell you

ResultWhat it is
Billable share of the dayThe headline result. A percentage.
Unbilled hours per monthA number.
Revenue those hours would have carriedA money figure.
What the unbilled hours cost in wagesA money figure.

Before you rely on this number

Conductor sizing, voltage drop and load figures are governed by code, and the code takes precedence over any calculator. Ambient temperature, conduit fill, continuous load factors and the specific installation all change the answer. Treat this as a first pass, not a design.

Estimating is the easy part

The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.