Ceramic Coating Pricing Calculator

Price a coating package from correction hours, coating tier and the bay time the cure occupies.

Your numbers

$
Burdened: wages plus tax, insurance and the vehicle, not the hourly wage.
$
$
Permits, disposal, equipment hire, subcontractors.
%
Overhead as a share of revenue. Work it out from last year's accounts.
%

Result

Price to quote $666.67
Direct cost $420
Overhead recovered $146.67
Net profit $100.00
Gross margin 37.0%
Markup on direct cost 58.7%
Quote $666.67 to cover $420 of direct cost, recover $146.67 of overhead and leave $100.00 of net profit. That is a 58.7% markup on cost.

Overhead and margin are taken as shares of the selling price, which is why the cost is divided rather than multiplied. Adding 15% to cost does not produce a 15% margin. Gross profit is what is left after the cost of doing the job. Overhead comes out of that: the building, the office wages, the vans, insurance, software and advertising. A healthy gross margin still loses money if overhead is larger.

Get a Free Business Audit

What moves the number

  • Correction level included, since one-step and multi-stage are very different jobs.
  • Coating product tier and its stated durability.
  • Bay days consumed including cure, which is capacity you cannot sell to anyone else.

Where this one goes wrong

Selling a coating package where the correction level is vague. The customer hears that their paint will look perfect, and the gap between that and a one-step correction is where the argument happens.

Questions

About this calculator

How should coating packages be structured?

By correction level and coating durability, stated explicitly. Packages that differ only in the coating product while vaguely describing the preparation cause disputes about the result.

Should maintenance be sold with the coating?

It is worth offering, because coatings need maintenance to reach their stated life and a poorly maintained coating reflects on you rather than on the product.

How much bay time does a coating really take?

The correction hours plus application plus cure, and the cure occupies the space while earning nothing. Pricing that excludes cure time undervalues the job.

How useful was this calculator?

Not rated yet. Yours would be the first.

The formula

price = direct cost / (1 - overhead% - margin%)

Put this calculator on your site

Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.

Please keep the attribution line. It is the only thing we ask in return.

How to use this calculator

  1. Labour cost ($). Burdened: wages plus tax, insurance and the vehicle, not the hourly wage.
  2. Materials cost ($). Enter your own figure; the page starts at $180.
  3. Other direct costs ($). Permits, disposal, equipment hire, subcontractors.
  4. Overhead rate (%). Overhead as a share of revenue. Work it out from last year's accounts.
  5. Target net margin (%). Enter your own figure; the page starts at 15%.

The result updates as you type, so you can try a figure, see what it does to price to quote, and change it back. Nothing you enter is sent anywhere or saved.

A worked example

These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.

What goes in

InputValue
Labour cost$240
Materials cost$180
Other direct costs$0
Overhead rate22%
Target net margin15%

What comes out

ResultValue
Price to quote main result$666.67
Direct cost$420
Overhead recovered$146.67
Net profit$100.00
Gross margin37.0%
Markup on direct cost58.7%

Quote $666.67 to cover $420 of direct cost, recover $146.67 of overhead and leave $100.00 of net profit. That is a 58.7% markup on cost.

How sensitive the answer is

Holding everything else steady and changing only labour cost, this is what happens to price to quote. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.

Labour cost ($)Price to quote
$120 $476.19
$180 $571.43
$240 example above $666.67
$360 $857.14
$480 $1,048

Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.

What each figure means

Labour cost ($)
Burdened: wages plus tax, insurance and the vehicle, not the hourly wage.
Materials cost ($)
A money amount, starting at $180.
Other direct costs ($)
Permits, disposal, equipment hire, subcontractors.
Overhead rate (%)
Overhead as a share of revenue. Work it out from last year's accounts.
Target net margin (%)
A percentage, between 0 and 80, starting at 15%.

What the results tell you

ResultWhat it is
Price to quoteThe headline result. A money figure.
Direct costA money figure.
Overhead recoveredA money figure.
Net profitA money figure.
Gross marginA percentage.
Markup on direct costA percentage.