Flooring
Carpet Flooring Cost Calculator
Prices carpet, where the pad underneath and the stretch decide how long it looks new.
Result
A planning estimate, not a quote. Access, the age of the equipment, what is found once it is opened up and local labour rates all move the real figure, sometimes a long way.
Get a Free Business AuditHow the calculation works
Hours times crew times rate, plus materials and the call-out. Carpet is priced by area, but it is supplied in fixed width rolls, so the usable area depends on how the room lays out against that width and a room slightly wider than the roll generates a seam and substantial waste. Labour is fitting tack strip, laying pad, cutting in and then stretching the carpet properly. The pad is a separate material decision that affects comfort and wear far more than its cost suggests.
What moves the number
- Room dimensions against roll width, which determines seams and waste.
- Pad specification, since an inadequate pad shortens carpet life noticeably.
- Stairs, which take considerably more labour per square foot than rooms.
- Pattern, because a patterned carpet has to be matched at seams and wastes more.
Where this one goes wrong
Carpet needs power stretching, not just kicking in. A carpet fitted with a knee kicker alone is not under proper tension, and it will ripple and buckle within a year or two, which the customer will read as a defective carpet. A power stretcher is the tool for it and using one is the difference between a carpet that stays flat and one that has to be refitted. The pad is the other quiet decision: a cheap thin pad lets the carpet backing take the abuse of foot traffic and wears the carpet out early, so skimping there shortens the life of the expensive component. Many carpet warranties specify a minimum pad.
Before you quote
- Power stretch the carpet rather than only kicking it in.
- Specify a pad that meets the carpet warranty's minimum.
- Plan seams away from doorways and main sight lines.
Questions
About this calculator
Why is my carpet rippling?
Almost always because it was not power stretched when fitted. A carpet kicked in without proper tension relaxes and buckles within a year or two. It is a fitting fault rather than a fault in the carpet, and correcting it means lifting and restretching.
Does carpet pad really matter?
More than its price suggests. The pad absorbs foot traffic that would otherwise crush the carpet backing, so a thin cheap pad wears out an expensive carpet early. Many carpet warranties specify a minimum pad, which makes it a condition of cover rather than an upgrade.
Why is there so much carpet waste?
Because it comes in fixed width rolls and a room has to be cut from that width. A room slightly wider than the roll needs a seam and generates a large offcut, and patterned carpet wastes more again because the pattern has to match at seams. The waste is a function of the room's dimensions rather than carelessness.
The formula
total = hours x people x rate + parts + call-out, then sales tax
Put this calculator on your site
Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.
Please keep the attribution line. It is the only thing we ask in return.
How to use this calculator
- Hours on site (h). Enter your own figure; the page starts at 18 h.
- People needed. Enter your own figure; the page starts at 1.
- Labour rate charged ($). Enter your own figure; the page starts at $74.
- Parts and materials ($). Enter your own figure; the page starts at $2,100.
- Call-out or diagnostic fee ($). Enter your own figure; the page starts at $95.
- Sales tax (%). Leave at zero if you are quoting before tax.
The result updates as you type, so you can try a figure, see what it does to estimated total, and change it back. Nothing you enter is sent anywhere or saved.
A worked example
These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.
What goes in
| Input | Value |
|---|---|
| Hours on site | 18 h |
| People needed | 1 |
| Labour rate charged | $74 |
| Parts and materials | $2,100 |
| Call-out or diagnostic fee | $95 |
| Sales tax | 0% |
What comes out
| Result | Value |
|---|---|
| Estimated total main result | $3,527 |
| Labour | $1,332 |
| Before tax | $3,527 |
| Sales tax | $0 |
About $3,527: $1,332 of labour, $2,100 of parts and a $95 call-out.
How sensitive the answer is
Holding everything else steady and changing only labour rate charged, this is what happens to estimated total. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.
| Labour rate charged ($) | Estimated total |
|---|---|
| $37 | $2,861 |
| $56 | $3,203 |
| $74 example above | $3,527 |
| $111 | $4,193 |
| $148 | $4,859 |
Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.
What each figure means
- Hours on site (h)
- Measured in h, between 0 and 400, starting at 18 h.
- People needed
- A number, between 0 and 40, starting at 1.
- Labour rate charged ($)
- A money amount, starting at $74.
- Parts and materials ($)
- A money amount, starting at $2,100.
- Call-out or diagnostic fee ($)
- A money amount, starting at $95.
- Sales tax (%)
- Leave at zero if you are quoting before tax.
What the results tell you
| Result | What it is |
|---|---|
| Estimated total | The headline result. A money figure. |
| Labour | A money figure. |
| Before tax | A money figure. |
| Sales tax | A money figure. |
Estimating is the easy part
The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.