Total what one repair genuinely costs the shop once burdened labour, parts, supplies and bay time are all counted.

Your numbers

h
$
%
Payroll tax, insurance, holiday, training. On top of the wage.
$
h
$
Annual overhead divided by billable hours.

Result

True job cost $1,181
Labour including burden $611.71
Overhead absorbed $389.40
Cost per labour hour $66.73
The job costs $1,181: $611.71 of burdened labour, $180 of materials and $389.40 of overhead. Anything you charge below that loses money.

Travel time is counted because it is paid and it occupies the day, whether or not the customer sees it on the invoice. Gross profit is what is left after the cost of doing the job. Overhead comes out of that: the building, the office wages, the vans, insurance, software and advertising. A healthy gross margin still loses money if overhead is larger.

Get a Free Business Audit

What moves the number

  • Burdened labour for every hour touched, including the diagnostic hour and the road test.
  • Parts at cost, including freight and any core not returned.
  • Consumables and disposal, which are small per job and material across a year.

Where this one goes wrong

Counting only the hours that were billed. Moving the vehicle, ordering the part, chasing the supplier and the second road test are all paid time that belongs to the job.

Questions

About this calculator

Do I need to cost every job?

No. Cost a representative sample across your usual mix and the pattern appears quickly. Costing everything becomes a project that gets abandoned.

Where does fluid disposal belong?

In the job that produced it. Rolled into general overhead it disappears; attached to oil and coolant work it shows which services are thinner than they look.

What do I do with the findings?

Look for what the unprofitable jobs share. It is usually a job type, a vehicle platform or a customer, and each has a different fix.

How useful was this calculator?

Not rated yet. Yours would be the first.

The formula

cost = (job hours + travel) x crew x wage x (1 + burden%) + materials + overhead per hour

Put this calculator on your site

Free to embed. Paste this where you want it to appear. It stays up to date automatically because it loads from BDEVY.

Please keep the attribution line. It is the only thing we ask in return.

How to use this calculator

  1. Labour hours (h). Enter your own figure; the page starts at 2.2 h.
  2. People on the job. Enter your own figure; the page starts at 6.
  3. Hourly wage ($). Enter your own figure; the page starts at $27.
  4. Labour burden (%). Payroll tax, insurance, holiday, training. On top of the wage.
  5. Materials ($). Enter your own figure; the page starts at $180.
  6. Travel hours (h). Enter your own figure; the page starts at 0.75 h.

The result updates as you type, so you can try a figure, see what it does to true job cost, and change it back. Nothing you enter is sent anywhere or saved.

A worked example

These are the figures the calculator opens with. Every number in the results column below is produced by the same calculation the page runs, so you can follow it through before putting your own figures in.

What goes in

InputValue
Labour hours2.2 h
People on the job6
Hourly wage$27
Labour burden28%
Materials$180
Travel hours0.75 h
Overhead per working hour$22

What comes out

ResultValue
True job cost main result$1,181
Labour including burden$611.71
Overhead absorbed$389.40
Cost per labour hour$66.73

The job costs $1,181: $611.71 of burdened labour, $180 of materials and $389.40 of overhead. Anything you charge below that loses money.

How sensitive the answer is

Holding everything else steady and changing only hourly wage, this is what happens to true job cost. It is worth knowing which of your inputs the answer actually hinges on, and which barely move it.

Hourly wage ($)True job cost
$13.5 $875.26
$20.25 $1,028
$27 example above $1,181
$40.5 $1,487
$54 $1,793

Every other input is held at the example value while this one changes, which is not how a real job behaves. Treat it as a guide to which number matters most, not as five separate quotes.

What each figure means

Labour hours (h)
Measured in h, starting at 2.2 h.
People on the job
A number, between 0 and 30, starting at 6.
Hourly wage ($)
A money amount, starting at $27.
Labour burden (%)
Payroll tax, insurance, holiday, training. On top of the wage.
Materials ($)
A money amount, starting at $180.
Travel hours (h)
Measured in h, starting at 0.75 h.
Overhead per working hour ($)
Annual overhead divided by billable hours.

What the results tell you

ResultWhat it is
True job costThe headline result. A money figure.
Labour including burdenA money figure.
Overhead absorbedA money figure.
Cost per labour hourA money figure.

Estimating is the easy part

The jobs you never hear about cost more than the ones you mis-measure. BDEVY builds the marketing, systems and automation that bring them in.