Guide · 6 min read

HVAC Maintenance Agreement Checklist for Contractors

A working checklist for building the plan, selling it, delivering the visits, documenting the work and renewing — the whole agreement lifecycle.

Published 12 September 2026 · BDEVY

# HVAC Maintenance Agreement Checklist for Contractors

Agreements do not usually fail on the contract. They fail in the eleven months afterwards — a visit that slipped, a report nobody sent, a date nobody looked at.

This is the checklist for the whole lifecycle. Work it in order: build the plan → sell it → activate → deliver → document → renew.


1 · Building the plan

  • Number of visits per term decided, and when they fall
  • What each visit includes, written out item by item
  • Where maintenance ends and repair begins, stated explicitly
  • Benefits listed — priority, discounts, inclusions
  • Repair discount set, and its cost to you calculated
  • Burdened labour cost per visit calculated, not the wage
  • Parts and materials per visit costed
  • Travel cost per visit included
  • Admin cost per member per year included
  • Total cost to deliver known before the price is set
  • Price derived from a target margin, not a markup
  • Margin verified: (Price − Cost) ÷ Price
  • Billing options decided — annual, quarterly, monthly
  • Monthly option priced for the extra admin it carries
  • Terms written: cancellation, transfer, renewal
  • Automatic renewal clause reviewed by an attorney in your state, if you use one

2 · The agreement document

  • Company name, address, phone and licence number
  • Agreement number, start date, end date
  • Customer name and billing contact
  • Service address, if different from billing
  • Covered equipment listed by make, model and serial
  • A line stating that systems not listed are not covered
  • Visits included, and the period they must be taken in
  • What each visit includes
  • Benefits and discounts, precisely worded
  • Exclusions written out explicitly
  • Price, billing frequency and payment terms
  • Cancellation terms and how a refund is calculated
  • Transfer terms for a sale of the property
  • Renewal terms — and whether it renews automatically
  • Acceptance block, retrievable later

3 · Selling it

  • Offered at the right moment — after a repair, visit or install
  • Not offered mid-emergency, or before the problem is fixed
  • Technicians can explain it in three sentences
  • The price is stated plainly, not hedged
  • Two or three tiers offered, not one or five
  • Technicians can close it on the spot, from the property
  • A "not now" is recorded with a date to ask again
  • Nobody is working to a signature quota

4 · Activating it

  • Payment taken or recurring billing set up
  • First visit scheduled before anyone leaves the property
  • Covered equipment confirmed and recorded with serials
  • Welcome note sent stating what is included
  • Renewal reminder set for 90 days before expiry
  • Account owner assigned

5 · Delivering the visits

  • Every included visit exists as a record with a due date
  • Overdue visits visible without anyone going to look for them
  • Someone owns the outstanding list
  • Members offered appointments ahead of non-members, if you promised priority
  • Maintenance not perpetually displaced by emergency work
  • Missed appointments rebooked the same week, inside the term
  • Visits taken inside the term, not carried past it

6 · The visit itself

  • Checklist completed item by item, not from memory afterwards
  • Filter changed or cleaned, and recorded
  • Electrical connections and amp draw checked
  • Capacitor reading taken against the rating
  • Refrigerant performance and temperature split checked
  • Coil condition inspected
  • Condensate drain cleared and float switch tested
  • Blower and motor amps checked
  • Thermostat operation and staging verified
  • Safety controls tested
  • Heat exchanger inspected where applicable
  • Overall condition assessed in one word
  • Photographs taken where they will matter later
  • Equipment condition updated on the record

7 · Documenting it

  • Findings written in words the customer can follow
  • Anything flagged explained, not just ticked
  • Recommended repairs recorded — and recorded when declined, with a date
  • Replacement flagged where the system warrants the conversation
  • Report sent the same day
  • Next visit date stated on the report
  • Recommended work turned into an estimate, with an owner

8 · Renewing

  • Agreements identified 90 days before expiry
  • Visits audited — anything outstanding delivered first
  • Owner assigned to each renewal
  • 60-day email with the year's reports attached
  • 30-day reminder
  • 14-day call from a person
  • 7-day final notice
  • Renewal price decided, and any increase explainable
  • New term's visits scheduled at the point of renewal
  • Declines recorded with a reason
  • Lapsed agreements moved to a win-back list, not forgotten

9 · Reviewing, monthly

  • Active agreements, and monthly recurring revenue
  • Renewal rate — renewed ÷ (renewed + declined + lapsed)
  • Visits outstanding across the whole book
  • Margin by plan tier
  • Agreement penetration — live agreements ÷ total customers
  • Customers with no agreement, sorted by lifetime value
  • Decline reasons, read rather than filed

The eight that cost the most when missed

#Missed checkWhat it costs
1Cost to deliver never calculatedA tier that loses money on every renewal
2Priced by markup while budgeting by marginRoughly twenty points, every agreement
3Repair discount left out of the costingOverstated margin on the tier you sell most
4Covered equipment not listed by serialThe most common dispute there is
5First visit not booked at the point of saleThe visit that proves the plan was worth buying
6Overdue visits not visibleThe main reason agreements do not renew
7No report after the visitNothing for the customer to remember at renewal
8Renewal started at 10 days, not 90A decision made under time pressure, which is a decline

From checklist to system

Print this. It works.

It works better when it does not depend on anyone remembering: plans defined once so the exclusions cannot be forgotten, every included visit existing as a record with a due date, overdue ones on the dashboard, reports generated from the visit rather than written afterwards, and renewals appearing on a list ninety days out with the visits-used column beside them.

See it working → Plans, agreements, visits, reports and renewals against a fictional contractor's book. No signup.


Related


Want these checks built into how your office already works? Talk to BDEVY →